2010 – US 17 Bridge over Tar River (Washington Bypass)
State: NC
Year: 2010
Owner: State
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 121.67
Total Bridge Length (ft.): 14784
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: Design-build,
Full lane closure; Incentive / disincentive clauses; Formalized partnering
Geotechnical Solutions:
Structural Solutions: Precast pile caps,
PT ducts/bonded; Socket connection (in precast substructure)
2009 – Route 31 Bridge over Canandaigua Outlet
State: NY
Year: 2009
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 87.42
Total Bridge Length (ft.): 87.42
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams,
CIP reinforced closure joints, UHPC closure joints, asphalt overlay w/membrane
2009 – Black Cat Road Bridge
State: ID
Year: 2009
Owner: State
Location: Rural
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 97
Total Bridge Length (ft.): 196
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Precast cap & column(s); MSE walls,
Bars in splice couplers; Grouted duct connection (in precast substructure)
2009 – MD 362 Bridge over Monie Creek
State: MD
Year: 2009
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 55
Total Bridge Length (ft.): 55
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams; Precast abutment cap; Precast wingwalls; Steel sheet piling,
CIP reinforced concrete closure joints; Grouted key closure joints; Bars in splice couplers; PT ducts/bonded; Socket connection (in precast substructure)-(caps); Precast curbs; Latex-modified overlay
Route 23 Bridge over Otego Creek
State: NY
Year: 2009
Owner: State
Location: Rural
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 131.2
Total Bridge Length (ft.): 131.2
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT (with UHPC closure joints),
CIP reinforced closure joints, UHPC closure joints, standard concrete overlay
2009 – CTH B Bridge over Parsons Creek
State: WI
Year: 2009
Owner: Fond du Lac County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 21.67
Total Bridge Length (ft.): 21.67
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: In-house force: county crews,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Precast 3-sided culvert; Precast wingwalls,
Grouted key closure joints
2009 – I-80 Bridge over 2300 East
State: UT
Year: 2009
Owner: State
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 80
Total Bridge Length (ft.): 80
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide
Project Planning: State process,
design-build (low bid),
full lane closure; incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: FDcBc (full-width concrete-decked concrete beam unit),
precast approach slab; LWC deck
2009 – Inyan Kara Creek Bridge
State: WY
Year: 2009
Owner: Crook County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 85
Total Bridge Length (ft.): 85
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast abutment caps; Precast backwalls; Precast wingwalls,
Grouted key closure joints
2009 – 640th Street Bridge over Branch Raccoon River
State: IA
Year: 2009
Owner: Buena Vista County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 50.83
Total Bridge Length (ft.): 50.83
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent box beams; Precast abutment caps; Precast backwalls; Precast wingwalls,
Grouted key closure joints; Socket connection (in precast substructure); Epoxy joints
2008 – Hardscrabble Creek Bridge
State: CA
Year: 2008
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 133.5
Total Bridge Length (ft.): 133.5
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Lateral Slide
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Prestressed multi-cell box girder span,