2010 – 41st Street Bridge
State: SD
Year: 2010
Owner: City of Sioux Falls
Location: Urban
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 125
Total Bridge Length (ft.): 305
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
A+B bidding, incentive / disincentive clause, lump sum
Geotechnical Solutions:
Structural Solutions: adjacent box beam,
grouted key closure joint, PT ducts/bonded

2010 – Willis Avenue Bridge over Harlem River
State: NY
Year: 2010
Owner: New York City
Location: Urban
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 350
Total Bridge Length (ft.): 2012
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: SPMTs
Project Planning: State process; FHWA process,
Right-of-way acquisition,
Design-Bid-Build,
Formalized partnering; Value Engineering
Geotechnical Solutions: Micropiles,
Structural Solutions: Steel grid (concrete filled) deck; Precast cap shells; Steel sheet piling; Precast retaining walls; Modular block walls; MSE walls,
Truss span w/deck,
CIP reinforced concrete closure joints; Grouted key closure joints; Match cast closure joints; Steel diaphragms; LWC deck

2010 – North Kahana Stream Bridge
State: HI
Year: 2010
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 46
Total Bridge Length (ft.): 128
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure, lane rental, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: adjacent slab beam,
grouted key closure joint

2010 – Kickapoo Bridge
State: MS
Year: 2010
Owner: City of Clinton
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 31
Total Bridge Length (ft.): 124
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: adjacent slab beam, precast pile cap, precast abutment cap, precast wingwall,
grouted key closure joint, socket connection (in precast substructure), prefabricated railing

2010 – I-70 Bridge over Eagle Canyon (Eastbound)
State: UT
Year: 2010
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 375
Total Bridge Length (ft.): 491
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Other ABC Method
Project Planning: State process,
CM/GC,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT,
Grouted key closure joint; PT ducts/bonded; Thin-bonded epoxy overlay; LWC deck

2010 – Phillipston Bridge
State: MA
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 60.67
Total Bridge Length (ft.): 60.67
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: SPMTs
Project Planning: State process,
design-build,
full lane closure, incentive / disincentive clause, no excuse bonus, lump sum bonus
Geotechnical Solutions:
Structural Solutions: precast abutment cap w/backwall,
FDcBs (Full-width decked beam),
asphalt overlay w/membrane

2010 – I-15 / Layton Parkway Bridge
State: UT
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 108.8
Total Bridge Length (ft.): 217.8
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Longitudinal Launching
Project Planning: State process,
design-build,
incentive / disincentive clause
Geotechnical Solutions: embankment surcharge
Structural Solutions: MSE wall,
FDcBs (full-width concrete-decked steel beam unit),
CIP reinforced closure joint, thin-bonded epoxy overlay, LWC deck

2010 – Biltmore Avenue Bridge
State: NC
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 135
Total Bridge Length (ft.): 135
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: • Design-Bid-Build,
• Full lane closure
Geotechnical Solutions: • Micropiles,
Structural Solutions: MDcBs (Modular decked beams),
CIP reinforced concrete closure joints

2010 – I-15 / Pioneer Crossing Bridge
State: UT
Year: 2010
Owner: State
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 191
Total Bridge Length (ft.): 191
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: SPMTs
Project Planning: State process,
design-build, alternative technical concept,
full lane closure, incentive / disincentive clause
Geotechnical Solutions: embankment surcharge
Structural Solutions: MSE wall,
FDcBc (full-width concrete-decked concrete beam unit),
CIP reinforced closure joint

2010 – US 17 Bridge over Tar River (Washington Bypass)
State: NC
Year: 2010
Owner: State
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 121.67
Total Bridge Length (ft.): 14784
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: design-build,
full lane closure, incentive / disincentive clause, formalized partnering
Geotechnical Solutions:
Structural Solutions: precast pile cap,
PT ducts/bonded, socket connection (in precast substructure)