2011 – I-84 Bridge F-114
State: UT
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 55.83
Total Bridge Length (ft.): 147
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional
Project Planning: State process,
design-bid-build,
A+B+C bidding (A B C bidding), lane rental, incentive / disincentive clause, value engineering
Geotechnical Solutions:
Structural Solutions: full-depth precast deck panel w/o PT,
grouted key closure joint, grouted blockout w/shear connector, asphalt overlay w/membrane, LWC deck

2011 – I-5 / US 12 Bridge at Grand Mound
State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 88
Total Bridge Length (ft.): 176
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s),
CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms

2011 – I-44 Bridge over Gasconade River
State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide
Project Planning: design-bid-build,
A+B bidding (A B bidding), full lane closure, incentive / disincentive clause, contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),

2011 – I-20 / LA 3249 (Well Road) Bridge
State: LA
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 85
Total Bridge Length (ft.): 260
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: SPMTs
Project Planning: design-bid-build,
A+B bidding, (A B bidding), full lane closure, lane rental
Geotechnical Solutions: CIP substructure under traffic,
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),

2011 – I-15 / Sam White Lane Bridge
State: UT
Year: 2011
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 177
Total Bridge Length (ft.): 354
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: SPMTs
Project Planning: State process,
design-build,
full lane closure
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),
CIP reinforced closure joint, thin-bonded epoxy overlay, LWC deck

2011 – Craig Creek Bridge
State: CA
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 108
Total Bridge Length (ft.): 108
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure, value engineering
Geotechnical Solutions:
Structural Solutions: adjacent box beam, precast abutment cap w/backwall, precast wingwall,
CIP reinforced closure joint, grouted key closure joint, PT ducts/bonded, pocket connection (in precast substructure)

2011 – Chester VT 103 Bridge 9
State: VT
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 119.81
Total Bridge Length (ft.): 119.81
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Other ABC Method
Project Planning: State process,
design-bid-build,
full lane closure, incentive / disincentive clause, lump sum bonus
Geotechnical Solutions:
Structural Solutions: precast abutment cap, precast wingwall,
match cast closure joint (abutments), PT ducts/un-bonded (abutments), socket connection (abutments), epoxy joint (abutments), asphalt overlay w/membrane, precast approach slab

2011 – Chester VT 103 Bridge 8
State: VT
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 56
Total Bridge Length (ft.): 56
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Other ABC Method
Project Planning: State process,
design-bid-build,
full lane closure, incentive / disincentive clause, lump sum bonus
Geotechnical Solutions:
Structural Solutions: MDcBc {Modular concrete-Decked concrete Beam} (28D NEXT Beam), precast abutment cap, precast abutment stem, precast abutment footing,
CIP reinforced closure joint (deck), match cast closure joint (abutments), grouted key closure joint (abutments), bars in splice coupler (abutments), socket connections (abutments), epoxy joint (abutments), asphalt overlay w/membrane, precast approach slab, precast curb

2011 – Cedar Street Bridge (Wellesley)
State: MA
Year: 2011
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 41.54
Total Bridge Length (ft.): 83.08
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: SPMTs
Project Planning: State process, benefit/cost method,
right-of-way acquisition, electronic shop drawing submittal & approval process,
design-build,
full lane closure, incentive / disincentive clause, no excuse bonus, lump sum bonus
Geotechnical Solutions: reused substructure/foundation unit,
Structural Solutions: precast column cap (precast bent cap; precast crossbeam), precast abutment cap,
FDcBs (Full-width concrete-decked steel beam),
precast approach slab, CIP reinforced closure joint, bars in splice coupler, asphalt overlay w/membrane

2011 – Buffalo Creek Bridge
State: SD
Year: 2011
Owner: Perkins County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 60
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee); Steel sheet piling; Other abutment and wall element - precast planks,
Grouted key closure joints