2011 – Lake Champlain Bridge

State: NY
Year: 2011
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 480
Total Bridge Length (ft.): 2200
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: early environmental clearance & permitting; electronic shop drawing submittal & approval process, Design-Bid-Build,
Geotechnical Solutions: micropiles,
Structural Solutions: arch span w/o deck; full-depth precast deck panel w/PT; precast caisson caps, prefabricated railing


2011 – Uxbridge –River Road Bridge over Ironstone Brook

State: MA
Year: 2011
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 47
Total Bridge Length (ft.): 47
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, value engineering
Geotechnical Solutions:
Structural Solutions: MDcBs/FSPGS {Modular concrete-Decked steel Beam}, precast abutment stem, precast retaining wall, CIP reinforced concrete closure joint, PT ducts/bonded, match cast closure joint, socket connection (in precast substructure), epoxy joint, micro-silica concrete overlay, precast curb


2011 – I-84 Bridge F-114

State: UT
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 55.83
Total Bridge Length (ft.): 147
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: State process, Design-bid-build, A+B+C bidding; Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT, Grouted key closure joint; Grouted blockout w/shear connectors; Asphalt overlay w/membrane; LWC deck


2011 – I-15 / Sam White Lane Bridge

State: UT
Year: 2011
Owner: State
Location: Urban
Beam material: Steel

Spans: Two-span
Max Span Length (ft.): 177
Total Bridge Length (ft.): 354
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: SPMTs

Project Planning: State process, Design-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit), CIP reinforced concrete closure joints; Thin-bonded epoxy overlay; LWC deck


2011 – SR 303 Manette Bridge

State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 250
Total Bridge Length (ft.): 1550
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: Design-Bid Build
Geotechnical Solutions:
Structural Solutions: Precast caisson caps,


2011 – Chester VT 103 Bridge 8

State: VT
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 56
Total Bridge Length (ft.): 56
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Other ABC Method

Project Planning: State process, design-bid-build, full lane closure, incentive / disincentive clauses, lump sum bonus
Geotechnical Solutions:
Structural Solutions: MDcBc {Modular concrete-Decked concrete Beam} (28D NEXT Beam), precast abutment caps, precast abutment stems, precast footing(s), CIP reinforced closure joint (deck), match cast closure joints (abutments), grouted key closure joints (abutments), bars in splice couplers (abutments), socket connections (abutments), epoxy joints (abutments), asphalt overlay w/membrane, precast approach slabs, precast curbs


2010 – I-93 Bridge over Loudon Road (Route 9)

State: NH
Year: 2010
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 82
Total Bridge Length (ft.): 82
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: State Process, Design-bid-build, Incentive / disincentive clauses; No Excuse bonus; Value Engineering
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT, CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Asphalt overlay w/membrane


2010 – Vista Interchange Bridge

State: ID
Year: 2010
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 91.5
Total Bridge Length (ft.): 182
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Lane rental; Value Engineering
Geotechnical Solutions:
Structural Solutions: Precast column cap (precast bent cap; precast crossbeam); Precast abutment cap; MSE wall, Bars in splice couplers; Grouted duct connection (in precast substructure)


2010 – Eastern Avenue Bridge

State: DC: District of Columbia
Year: 2010
Owner: District Department of Transportation
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 42.33
Total Bridge Length (ft.): 84.67
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions: Other foundation/wall: undercut unsuitable in-situ materials and replaced with compacted aggregate base under spread footing,
Structural Solutions: MDcBs (Modular decked beams); Precast cap & column(s), CIP reinforced concrete closure joints; Grouted key closure joints; Asphalt overlay w/membrane; LWC deck


2010 – Gordon’s Corner Road Bridge over Route 9

State: NJ
Year: 2010
Owner: State
Location: Urban
Beam material: Steel

Spans: Two-span
Max Span Length (ft.): 59
Total Bridge Length (ft.): 118
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning:

• Design-bid-build

,

• Full lane closure• Incentive / disincentive clauses


Geotechnical Solutions:
Structural Solutions:

• Modular decked beams (MDcBs)

, CIP reinforced concrete closure joints; Precast approach slabs