2011 – I-44 Bridge over Gasconade River
State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide
Project Planning: Design-bid-build,
A+B bidding; Full lane closure; Incentive / disincentive clauses; Contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),

2011 – I-5 / US 12 Bridge at Grand Mound
State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 88
Total Bridge Length (ft.): 176
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s),
CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms

2011 – South Punaluu Stream Bridge
State: HI
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 170
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Value Engineering
Geotechnical Solutions:
Structural Solutions: Adjacent T beams; MDcBc (Modular decked beam – Precast decked tub beam),
Grouted key closure joints

2011 – I-20 / LA 3249 (Well Road) Bridge
State: LA
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 85
Total Bridge Length (ft.): 260
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: SPMTs
Project Planning: Design-bid-build,
A+B bidding; Full lane closure; Lane rental
Geotechnical Solutions: CIP substructure under traffic,
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),

2010 – I-70 Bridge over Eagle Canyon (Eastbound)
State: UT
Year: 2010
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 375
Total Bridge Length (ft.): 491
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Other ABC Method
Project Planning: State process,
CM/GC,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT,
Grouted key closure joint; PT ducts/bonded; Thin-bonded epoxy overlay; LWC deck

2010 – Phillipston Bridge
State: MA
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 60.67
Total Bridge Length (ft.): 60.67
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: SPMTs
Project Planning: State process,
Design-Build,
Full lane closure; Incentive / disincentive clauses; No Excuse bonus; Lump Sum bonus
Geotechnical Solutions:
Structural Solutions: Precast abutment cap w/backwall,
FDcBs (Full-width decked beam),
Asphalt overlay w/membrane

2010 – I-15 / Layton Parkway Bridge
State: UT
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 108.8
Total Bridge Length (ft.): 217.8
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Longitudinal Launching
Project Planning: State process,
Design-build,
Incentive / disincentive clauses
Geotechnical Solutions: Embankment surcharge
Structural Solutions: MSE walls,
FDcBs (full-width concrete-decked steel beam unit),
CIP reinforced concrete closure joints; Thin-bonded epoxy overlay; LWC deck

2010 – Biltmore Avenue Bridge
State: NC
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 135
Total Bridge Length (ft.): 135
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: • Design-Bid-Build,
• Full lane closure
Geotechnical Solutions: • Micropiles,
Structural Solutions: MDcBs (Modular decked beams),
CIP reinforced concrete closure joints

2010 – I-15 / Pioneer Crossing Bridge
State: UT
Year: 2010
Owner: State
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 191
Total Bridge Length (ft.): 191
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: SPMTs
Project Planning: State process,
Design-build; Alternative Technical Concept,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions: Embankment surcharge
Structural Solutions: MSE walls,
FDcBc (full-width concrete-decked concrete beam unit),
CIP reinforced concrete closure joints

2010 – US 17 Bridge over Tar River (Washington Bypass)
State: NC
Year: 2010
Owner: State
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 121.67
Total Bridge Length (ft.): 14784
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: Design-build,
Full lane closure; Incentive / disincentive clauses; Formalized partnering
Geotechnical Solutions:
Structural Solutions: Precast pile caps,
PT ducts/bonded; Socket connection (in precast substructure)