2011 – Boothbay Knickerbocker Bridge

State: ME
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 70
Total Bridge Length (ft.): 540
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: MDcBh (Modular concrete-Decked hybrid Beam - Hillman Composite Beam (HCB) w/ wings), Asphalt overlay w/membrane


2011 – TH 61 Bridge over Gilbert Creek

State: MN
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 41
Total Bridge Length (ft.): 123
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, A+B bidding; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent inverted T beams; Precast pile caps; Precast abutment stems; Precast wingwalls, CIP reinforced concrete closure joints; Socket connection (in precast substructure); Thin-bonded epoxy overlay


2011 – Buffalo Creek Bridge

State: SD
Year: 2011
Owner: Perkins County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 60
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee); Steel sheet piling; Other abutment element: precast planks, Grouted key closure joints


2011 – UPRR Bridge 126.31

State: KS
Year: 2011
Owner: Union Pacific Railroad (UPRR)
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 29.83
Total Bridge Length (ft.): 150
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: Design-Bid-Build, Full lane closure (i.e., full track closure)
Geotechnical Solutions:
Structural Solutions: Adjacent box beams; Precast pile caps; Precast abutment cap w/backwall; Precast wingwalls, Prefabricated railing


2011 – I-44 Bridge over Gasconade River

State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide

Project Planning: Design-bid-build, A+B bidding; Full lane closure; Incentive / disincentive clauses; Contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),


2011 – I-5 / US 12 Bridge at Grand Mound

State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 88
Total Bridge Length (ft.): 176
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s), CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms


2010 – North Kahana Stream Bridge

State: HI
Year: 2010
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 46
Total Bridge Length (ft.): 128
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams, Grouted key closure joints


2010 – Kickapoo Bridge

State: MS
Year: 2010
Owner: City of Clinton
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 31
Total Bridge Length (ft.): 124
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams; Precast pile caps; Precast abutment caps; Precast wingwalls, Grouted key closure joints; Socket connection (in precast substructure); Prefabricated railing


2010 – I-70 Bridge over Eagle Canyon (Eastbound)

State: UT
Year: 2010
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 375
Total Bridge Length (ft.): 491
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Other ABC Method

Project Planning: State process, CM/GC, Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT, Grouted key closure joint; PT ducts/bonded; Thin-bonded epoxy overlay; LWC deck


2010 – Phillipston Bridge

State: MA
Year: 2010
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 60.67
Total Bridge Length (ft.): 60.67
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: SPMTs

Project Planning: State process, Design-Build, Full lane closure; Incentive / disincentive clauses; No Excuse bonus; Lump Sum bonus
Geotechnical Solutions:
Structural Solutions: Precast abutment cap w/backwall, FDcBs (Full-width decked beam), Asphalt overlay w/membrane