1992 – Pelican Creek Bridge
State: AK
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 59.3
Total Bridge Length (ft.): 178
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee); Precast pile caps; Precast abutment caps,
PT ducts/bonded; Socket connection (in precast substructure)-(caps)

1992 – Oak Creek Bridge
State: AZ
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 190
Total Bridge Length (ft.): 190
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: FDcBc (full-width concrete-Decked concrete Beam Unit),

1983 – Linn Cove Viaduct
State: NC
Year: 1983
Owner: National Park Service
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 180
Total Bridge Length (ft.): 1243
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: FHWA Process,
Design-Bid-Build,
Geotechnical Solutions: Micropiles,
Structural Solutions: Precast segmental beam elements; Precast column(s),
PT ducts/bonded

1973 – Fremont Bridge
State: OR
Year: 1973
Owner: State
Location: Urban
Beam material: Steel
Spans: Three-span
Max Span Length (ft.): 1255
Total Bridge Length (ft.): 2152
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: State Process,
Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Orthotropic deck,
Arch span w/deck