1999 – Sedley Bridge

State: IN
Year: 1999
Owner: County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 110.5
Total Bridge Length (ft.): 110.5
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure
Geotechnical Solutions:
Structural Solutions: PT concrete through-girder, full-depth precast deck panel w/PT, MSE wall, grouted key closure joint, PT ducts/bonded, micro-silica concrete overlay


1999 – Beaufort and Morehead Railroad Trestle Bridge

State: NC
Year: 1999
Owner: State
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 33
Total Bridge Length (ft.): 495
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional

Project Planning: design-build, full lane closure (i.e., full track closure)
Geotechnical Solutions:
Structural Solutions: adjacent T beam, precast pile cap, precast abutment cap, precast backwall, precast wingwall, pocket connection (in precast substructure), prefabricated railing, other miscellaneous prefabricated element – precast flat slab transition span and thrust block rib


1998 – Dead Run and Turkey Run Bridges (VA)

State: VA
Year: 1998
Owner: National Park Service
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 113
Total Bridge Length (ft.): 402
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: other project delivery - competitive negotiated procurement, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: full-depth precast deck panel w/PT, grouted key closure joint, PT ducts/bonded, latex-modified overlay


1997 – Maritime Off-Ramp Bridge at I-80 & I-880

State: CA
Year: 1997
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 219
Total Bridge Length (ft.): 2356
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: design-bid-build, A+B bidding (A B bidding), full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: steel orthotropic box girder span,


1997 – Imnaha Bridge over Little Sheep Creek

State: OR
Year: 1997
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 110
Total Bridge Length (ft.): 110
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Lateral Slide

Project Planning: State process, Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Steel grid (concrete filled) deck, Other superstructure system - half-width curved steel girder span with concrete-filled steel-grid deck, CIP reinforced concrete closure joints


1996 – George P. Coleman Bridge

State: VA
Year: 1996
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 389
Total Bridge Length (ft.): 3750
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Other ABC Method

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clause; Lump Sum bonus; Formalized partnering
Geotechnical Solutions: Reused Substructure/Foundation Unit, CIP substructure under traffic,
Structural Solutions: Truss span w/deck, CIP reinforced concrete closure joints; LWC deck


1993 – US 27 Bridge over Pitman Creek

State: KY
Year: 1993
Owner: State
Location: Urban
Beam material: Steel

Spans: Three-span
Max Span Length (ft.): 300
Total Bridge Length (ft.): 700
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Conventional

Project Planning: design-bid-build,
Geotechnical Solutions:
Structural Solutions: exodermic deck, CIP reinforced closure joint, prefabricated railing, latex-modified overlay


1992 – Oak Creek Bridge

State: AZ
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 190
Total Bridge Length (ft.): 190
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: FDcBc (full-width concrete-Decked concrete Beam Unit),


1992 – Pelican Creek Bridge

State: AK
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 59.3
Total Bridge Length (ft.): 178
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: adjacent T beam (double tee), precast pile cap, precast abutment cap, PT ducts/bonded, socket connection (in precast substructure)-(caps)


1983 – Linn Cove Viaduct

State: NC
Year: 1983
Owner: National Park Service
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 180
Total Bridge Length (ft.): 1243
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: FHWA Process, Design-Bid-Build,
Geotechnical Solutions: Micropiles,
Structural Solutions: Precast segmental beam elements; Precast column(s), PT ducts/bonded