Found 126 Results

1996 – George P. Coleman Bridge

State: VA
Year: 1996
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 389
Total Bridge Length (ft.): 3750
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Other ABC Method

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clause; Lump Sum bonus; Formalized partnering
Geotechnical Solutions: Reused Substructure/Foundation Unit, CIP substructure under traffic,
Structural Solutions: Truss span w/deck, CIP reinforced concrete closure joints; LWC deck


1993 – US 27 Bridge over Pitman Creek

State: KY
Year: 1993
Owner: State
Location: Urban
Beam material: Steel

Spans: Three-span
Max Span Length (ft.): 300
Total Bridge Length (ft.): 700
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Conventional

Project Planning: Design-Bid-Build,
Geotechnical Solutions:
Structural Solutions: Exodermic Deck, CIP reinforced concrete closure joints; Prefabricated railing; Latex-modified overlay


1992 – Pelican Creek Bridge

State: AK
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 59.3
Total Bridge Length (ft.): 178
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee), Precast pile caps, Precast abutment caps, PT ducts/bonded, Socket connection (in precast substructure)-(caps)


1992 – Oak Creek Bridge

State: AZ
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 190
Total Bridge Length (ft.): 190
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: FDcBc (full-width concrete-Decked concrete Beam Unit),


1983 – Linn Cove Viaduct

State: NC
Year: 1983
Owner: National Park Service
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 180
Total Bridge Length (ft.): 1243
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: FHWA Process, Design-Bid-Build,
Geotechnical Solutions: Micropiles,
Structural Solutions: Precast segmental beam elements; Precast column(s), PT ducts/bonded


1973 – Fremont Bridge

State: OR
Year: 1973
Owner: State
Location: Urban
Beam material: Steel

Spans: Three-span
Max Span Length (ft.): 1255
Total Bridge Length (ft.): 2152
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: State Process, Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Orthotropic deck, Arch span w/deck