2001 – MD Route 24 Bridge over Deer Creek (Rocks Steel Truss Bridge)

State: MD
Year: 2001
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 122.5
Total Bridge Length (ft.): 122.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: FRP deck panels, CIP reinforced concrete closure joints; Grouted blockout w/shear connectors; Asphalt overlay w/o membrane


2001 – Illinois Route 29 Bridge over Sugar Creek

State: IL
Year: 2001
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 37.4
Total Bridge Length (ft.): 253.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT, CIP reinforced concrete closure joints, standard concrete overlay


2001 – I-5 / South 38th Street Bridge

State: WA
Year: 2001
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 164.25
Total Bridge Length (ft.): 325
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: • Design-bid-build, • Full lane closure• Incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: • Partial-depth precast deck panels,


2001 – Keaiwa Stream Bridge

State: HI
Year: 2001
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 34
Total Bridge Length (ft.): 230
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams, Grouted key closure joints


2000 – Kouwegok Slough Bridge

State: AK
Year: 2000
Owner: State
Location: Rural
Beam material: Steel

Spans: Three-span
Max Span Length (ft.): 144
Total Bridge Length (ft.): 378
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT, Precast pile caps, Precast abutment caps, Precast lagging panels, Grouted key closure joint, Grouted blockout w/shear connectors


1999 – Beaufort and Morehead Railroad Trestle Bridge

State: NC
Year: 1999
Owner: State
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 33
Total Bridge Length (ft.): 495
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional

Project Planning: Design-build, Full lane closure (i.e., full track closure)
Geotechnical Solutions:
Structural Solutions: Adjacent T beams; Precast pile caps; Precast abutment caps; Precast backwalls; Precast wingwalls, Pocket connection (in precast substructure); Prefabricated railing; Other miscellaneous element – precast flat slab transition spans and thrust block ribs


1999 – Sedley Bridge

State: IN
Year: 1999
Owner: Porter County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 110.5
Total Bridge Length (ft.): 110.5
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: PT concrete through-girder; MSE walls, CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Micro-silica concrete overlay


1998 – Dead Run and Turkey Run Bridges (VA)

State: VA
Year: 1998
Owner: National Park Service
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 113
Total Bridge Length (ft.): 402
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: Other project delivery: competitive negotiated procurement, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT, Grouted key closure joint; PT ducts/bonded; Latex-modified overlay


1997 – Imnaha Bridge over Little Sheep Creek

State: OR
Year: 1997
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 110
Total Bridge Length (ft.): 110
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Lateral Slide

Project Planning: State process, Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Steel grid (concrete filled) deck, Other superstructure system - half-width curved steel girder span with concrete-filled steel-grid deck, CIP reinforced concrete closure joints


1997 – Maritime Off-Ramp Bridge at I-80 & I-880

State: CA
Year: 1997
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 219
Total Bridge Length (ft.): 2356
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: Design-bid-build, A+B bidding, Full lane closure, Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Steel orthotropic box girder spans,