Strength and Serviceability of Reinforced Concrete Inverted T Beams

Strength and Serviceability of Reinforced Concrete Inverted T Beams

Category: Completed Projects
Group: Substructure
Subject: Inverted-Tee Beams
Key Words: Inverted-T Bent Caps, Strut-and-Tie Modeling, Crack Widths, Diagonal Cracking, Serviceability, Full-scale

Budget:
Project Length: 60 months
Start Date: 2009
Completion Date: 2013


Analysis of the State of the Art of Precast Concrete Bridge Substructure Systems - 1

Analysis of the State of the Art of Precast Concrete Bridge Substructure Systems

Category: Completed Projects
Group: Substructure
Subject: Substructure
Key Words: Prefabricated, Substructure, Precast Concrete, ABC

Budget:
Project Length: 48
Start Date: 2009
Completion Date: 2013


Evaluation of Grout-Filled Mechanical Splices for Precast Concrete Construction - 4

Evaluation of Grout-Filled Mechanical Splices for Precast Concrete Construction

Category: Completed Projects
Group: Substructure
Subject: Grouted Couplers Non-seismic
Key Words: Grout filled splices, mechanical splices, fatigue, slip testing, creep, NMB Splice Sleeve, Lenton Interlok

Budget: 0.00
Project Length: 0
Start Date: 2008
Completion Date: 2008


Implementation of a Prestressed Inverted T-Beam System with 0.7-inch Diameter Prestressing Strand on a Virginia Bridge - 2

Implementation of a Prestressed Inverted T-Beam System with 0.7-inch Diameter Prestressing Strand on a Virginia Bridge

Category: Completed Projects
Group: Superstructure
Subject: Inverted Ts
Key Words: Bridge construction; Bridge design; Bridge members; Cast in place concrete; Precast concrete; Reinforced concrete bridges; Reinforcing steel; Traffic congestion

Budget: 399678.00
Project Length: 30 months
Start Date: 2011
Completion Date: 2013


Lateral Connections for Double T Bridges

Lateral Connections for Double T Bridges

Category: Completed Projects
Group: Superstructure
Subject: Double T Connections
Key Words: Restressed, Concrete, Double,Tee, Lateral, Connection, Multibeam, Multi-Beam, Bridge

Budget:
Project Length: 24 months
Start Date: 1998
Completion Date: 2000


Accelerating the Construction Process of Highway Bridges

Accelerating the Construction Process of Highway Bridges

Category: Completed Projects
Group: Design-Making Tools
Subject:
Key Words: Accelerated construction techniques, innovative contracting, bidding, bridges, analytical hieracrchy process

Budget:
Project Length:
Start Date: 2013
Completion Date: 2013


Full Closure Strategic Analysis

Full Closure Strategic Analysis

Category: Completed Projects
Group: Design-Making Tools
Subject: Full Closure
Key Words: full road closures, decision tools, case studies

Budget:
Project Length:
Start Date: 2014
Completion Date: 2014


Polyurethane Foam Infill for Fiber-Reinforced Polymer (FRP) Bridge Deck Panels

Polyurethane Foam Infill for Fiber-Reinforced Polymer (FRP) Bridge Deck Panels

Category: Completed Projects
Group: Decks
Subject: FRP Decks
Key Words: Bridge Decks, Composites, Corrosion, Durability, Fiber-Reinforced Polymers, Polyurethane Foam, Vacuum-Assisted Resin Transfer Molding.

Budget:
Project Length:
Start Date: 2014
Completion Date: 2014


Bond Behavior of Reinforcing Steel in Ultra-High Performance Concrete

Bond Behavior of Reinforcing Steel in Ultra-High Performance Concrete

Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: Bond
Key Words: Ultra-high performance concrete, UHPC, fiber-reinforced concrete, reinforcing bar, bond strength, anchorage, development length, splice length

Budget:
Project Length:
Start Date: 2014
Completion Date: 2014


Precast Alternative for Flat Slab Bridges

Precast Alternative for Flat Slab Bridges

Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: NEXT Beams; Flat Slab Bridges
Key Words: Precast bridge joint, hollow-core bridge, NEXT D bridge, bridge construction, prestressed concrete bridge

Budget:
Project Length:
Start Date: 2013
Completion Date: 2013