2019 – Bridge 7345

State: NM
Year: 2019
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 92.5
Total Bridge Length (ft.): 325
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: State Process, Design-Bid-Build, A+B Bidding; Full Lane Closure; Incentive / Disincentive Clause
Geotechnical Solutions: Reused Substructure/Foundation Unit,
Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Approach Slab; UHPC Closure Joint; Thin-Bonded Epoxy Overlay


2017 – Cannelville Road Bridge

State: OH
Year: 2017
Owner: Muskingum County
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 52.5
Total Bridge Length (ft.): 52.5
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning:
Geotechnical Solutions:
Structural Solutions: Orthotropic deck - SPS (Sandwich Plate System); MDhBs (Modular hybrid-Decked steel Beam - SPS deck on press-brake-formed tub girders),


2017 – Sacramento Wash Crossing at Oatman Highway (Historic Route 66)

State: AZ
Year: 2017
Owner: Mohave County
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 112
Total Bridge Length (ft.): 113.83
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Other ABC Method

Project Planning: Programmatic Agreement, Design-Bid-Build, Incentive / Discentive Clause
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beams), precast abutment caps, precast backwalls, precast approach slabs, high-strength CIP reinforced closure joints


2017 – Bridge 1-438 on N463 Blackbird Station Road over Blackbird Creek

State: DE
Year: 2017
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 50
Total Bridge Length (ft.): 50
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Design-Bid-Build,
Geotechnical Solutions:
Structural Solutions: Adjacent box beams, precast abutment caps, precast wingwalls, precast prestressed concrete piles, precast curbs, prefabricated railing, UHPC closure joints, socket connection, UHPC overlay


2017 – Bridge NB-355 at Milepost A-57.66

State: PA
Year: 2017
Owner: Pennsylvania Turnpike Commission
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 118
Total Bridge Length (ft.): 118
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide

Project Planning: design-bid-build
Geotechnical Solutions: micropiles,
Structural Solutions: FDcBs {Full-Width concrete-Decked steel Beam Unit},


Wrights Corners Bridge

State: PA
Year: 2016
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 45
Total Bridge Length (ft.): 49
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Public-Private Partnership (P3),
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam) - Folded Steel Plate Girder System (FSPGS), CIP reinforced concrete closure joints, prefabricated railing, polyester polymer concrete overlay


Strodes Mills Bridge

State: PA
Year: 2016
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 50
Total Bridge Length (ft.): 54
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Public-Private Partnership (P3),
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam) - Folded Steel Plate Girder System (FSPGS), CIP reinforced concrete closure joints, prefabricated railing, polyester polymer concrete overlay


2016 – Franklin Avenue Bridge Rehabilitation

State: MN
Year: 2016
Owner: Hennepin County
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 400
Total Bridge Length (ft.): 1050
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: Benefit/Cost Method, Programmatic Agreements, Early Environmental Clearance & Permitting, Design-Bid-Build, Incentive / Disincentive Clause
Geotechnical Solutions:
Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Column Cap (Precast Spandrel Cap Beams), Precast Abutment Cap, UHPC Closure Joint, Polymer Concrete Overlay, Precast Approach Slab, Prefabricated Railing (Ornamental Rail Panels)


2014 – Larpenteur Avenue Bridge

State: MN
Year: 2014
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 91.2
Total Bridge Length (ft.): 187.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Lateral Slide

Project Planning: Design-Build, Best Value Award
Geotechnical Solutions:
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit}, Thin-Bonded Epoxy Overlay


2013 – I-84 Bridges over Dingle Ridge Road

State: NY
Year: 2013
Owner: State
Location: Urban
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 82
Total Bridge Length (ft.): 82
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Lateral Slide

Project Planning: Design-Bid-Build, Incentive / Disincentive Clause, Value Engineering
Geotechnical Solutions: CIP Substructure Under Traffic (abutment drilled shafts constructed outside footprint of bridge),
Structural Solutions: MDcBc (Type D NEXT Beams), Precast Wingwall, FDcBc (Full-width concrete-Decked concrete Beam unit - Type D NEXT Beams), Precast Diaphragm, Precast Approach Slab, Other Miscellaneous Element – Precast Sleeper Slab; UHPC Closure Joints; Asphalt Overlay w/Membrane