2013 – I-84 Bridges over Dingle Ridge Road
State: NY
Year: 2013
Owner: State
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 82
Total Bridge Length (ft.): 82
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Lateral Slide
Project Planning: Design-Bid-Build,
Incentive / Disincentive Clause, Value Engineering
Geotechnical Solutions: CIP Substructure Under Traffic (abutment drilled shafts constructed outside footprint of bridge),
Structural Solutions: MDcBc (Type D NEXT Beams), Precast Wingwall,
FDcBc (Full-width concrete-Decked concrete Beam unit - Type D NEXT Beams),
Precast Diaphragm, Precast Approach Slab, Other Miscellaneous Element – Precast Sleeper Slab; UHPC Closure Joints; Asphalt Overlay w/Membrane

2013 – TH 36 over Keller Lake Bridge
State: MN
Year: 2013
Owner: State
Location: Urban
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 46.5
Total Bridge Length (ft.): 118.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: precast pile caps; precast abutment stems; precast wingwalls; adjacent inverted T beams,
socket connection (in precast substructure)

2013 – Milton-Madison Bridge
State: IN
Year: 2013
Owner: States (Indiana and Kentucky)
Location: Urban
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 727
Total Bridge Length (ft.): 3200
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide
Project Planning: Design-build,
Full lane closure
Geotechnical Solutions: Reused Substructure/Foundation Unit; High-capacity piles; Other foundation/wall: finite element analysis of existing pier caissons with passive soil resistance / scour mitigation,
Structural Solutions: MSE walls,
Truss span w/deck,
CIP reinforced concrete closure joints

2012 – Burnt River & UPRR Bridge
State: OR
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 160
Total Bridge Length (ft.): 160
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: State process,
Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT; MSE walls,
CIP reinforced concrete closure joints; Grouted blockout w/shear connectors; UHPC closure joints

2012 – OR213 Bridge over Washington Street (Jughandle)
State: OR
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 130
Total Bridge Length (ft.): 130
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide
Project Planning: State process,
Design-bid-build,
Full lane closure; Best value award
Geotechnical Solutions:
Structural Solutions: FDcBs (Full-width concrete-decked steel beam unit,
CIP reinforced concrete closure joints

2012 – I-95 Bridge over Hermitage Road
State: VA
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 207
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method
Project Planning: Design-bid-build,
Lane rental; Incentive / disincentive clauses; No excuse bonus; Formalized partnering
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams),
CIP reinforced concrete closure joints; Grouted key closure joints; Bars in splice couplers; PT ducts/bonded; Match cast closure joint; Epoxy joints; Prefabricated railing

2012 – Montour Run Bridge No. 6
State: PA
Year: 2012
Owner: Allegheny County
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 47.8
Total Bridge Length (ft.): 47.8
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Other ABC Method
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Steel grid (concrete filled) deck; Precast abutment cap w/backwall,
FDcBs (full-width concrete-decked steel beam),
Precast curbs; LWC deck; Other miscellaneous element – precast moment slabs

2012 – Broadway Bridge over Little Timber Creek
State: NJ
Year: 2012
Owner: Camden County
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 66.5
Total Bridge Length (ft.): 66.5
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT (interim stage); Adjacent box beams,
Grouted blockout w/shear connectors; Asphalt overlay w/o membrane

2012 – TH 53 Bridge over Paleface River
State: MN
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 75
Total Bridge Length (ft.): 75
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT,
CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Thin-bonded epoxy overlay

2012 – Route 202 Bridge over Passaic River
State: NJ
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 92
Total Bridge Length (ft.): 92
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams); Precast abutment caps; Precast backwalls; Precast wingwalls,
CIP reinforced concrete closure joints; Socket connection (in precast substructure); Asphalt overlay w/o membrane; Precast approach slabs; Prefabricated railing; Other miscellaneous element – precast sleeper slabs