2012 – Rock County Road 55 Bridge over Railroad

State: MN
Year: 2012
Owner: Rock County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 82.5
Total Bridge Length (ft.): 82.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build,
Geotechnical Solutions: GRS IBS [Geosynthetic Reinforced Soil Integrated Bridge System],
Structural Solutions: adjacent box beams, GRS abutments, asphalt overlay w/o membrane


2012 – Burnt River & UPRR Bridge

State: OR
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 160
Total Bridge Length (ft.): 160
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: State process, Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT; MSE walls, CIP reinforced concrete closure joints; Grouted blockout w/shear connectors; UHPC closure joints


2012 – OR213 Bridge over Washington Street (Jughandle)

State: OR
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 130
Total Bridge Length (ft.): 130
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide

Project Planning: State process, Design-bid-build, Full lane closure; Best value award
Geotechnical Solutions:
Structural Solutions: FDcBs (Full-width concrete-decked steel beam unit, CIP reinforced concrete closure joints


2012 – I-95 Bridge over Hermitage Road

State: VA
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 207
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: design-bid-build, lane rental, Incentive / disincentive clauses, no excuse bonus, formalized partnering
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams), CIP reinforced closure joints, grouted key closure joints, bars in splice couplers, PT ducts/bonded, match cast closure joint, epoxy joints, prefabricated railing


2011 – Boothbay Knickerbocker Bridge

State: ME
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 70
Total Bridge Length (ft.): 540
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: MDcBh (Modular concrete-Decked hybrid Beam - Hillman Composite Beam (HCB) w/ wings), Asphalt overlay w/membrane


2011 – TH 61 Bridge over Gilbert Creek

State: MN
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 41
Total Bridge Length (ft.): 123
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, A+B bidding; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent inverted T beams; Precast pile caps; Precast abutment stems; Precast wingwalls, CIP reinforced concrete closure joints; Socket connection (in precast substructure); Thin-bonded epoxy overlay


2011 – Buffalo Creek Bridge

State: SD
Year: 2011
Owner: Perkins County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 60
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee); Steel sheet piling; Other abutment element: precast planks, Grouted key closure joints


2011 – UPRR Bridge 126.31

State: KS
Year: 2011
Owner: Union Pacific Railroad (UPRR)
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 29.83
Total Bridge Length (ft.): 150
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: Design-Bid-Build, Full lane closure (i.e., full track closure)
Geotechnical Solutions:
Structural Solutions: Adjacent box beams; Precast pile caps; Precast abutment cap w/backwall; Precast wingwalls, Prefabricated railing


2011 – I-44 Bridge over Gasconade River

State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide

Project Planning: Design-bid-build, A+B bidding; Full lane closure; Incentive / disincentive clauses; Contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),


2011 – I-5 / US 12 Bridge at Grand Mound

State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 88
Total Bridge Length (ft.): 176
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s), CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms