Reset Search
2012 – Broadway Bridge over Little Timber Creek
State: NJ
Year: 2012
Owner: Camden County
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 66.5
Total Bridge Length (ft.): 66.5
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT (interim stage); Adjacent box beams,
Grouted blockout w/shear connectors; Asphalt overlay w/o membrane
2012 – TH 53 Bridge over Paleface River
State: MN
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 75
Total Bridge Length (ft.): 75
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT,
CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Thin-bonded epoxy overlay
2012 – Route 202 Bridge over Passaic River
State: NJ
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 92
Total Bridge Length (ft.): 92
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams); Precast abutment caps; Precast backwalls; Precast wingwalls,
CIP reinforced concrete closure joints; Socket connection (in precast substructure); Asphalt overlay w/o membrane; Precast approach slabs; Prefabricated railing; Other miscellaneous element – precast sleeper slabs
2012 – Maryland Avenue Bridge
State: MN
Year: 2012
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 102.75
Total Bridge Length (ft.): 210.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: SPMTs
Project Planning: design-build,
best value award
Geotechnical Solutions: EPS geofoam
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit},
thin-bonded epoxy overlay
2011 – I-44 Bridge over Gasconade River
State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide
Project Planning: Design-bid-build,
A+B bidding; Full lane closure; Incentive / disincentive clauses; Contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),
2011 – I-5 / US 12 Bridge at Grand Mound
State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 88
Total Bridge Length (ft.): 176
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s),
CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms
2011 – South Punaluu Stream Bridge
State: HI
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 170
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Value Engineering
Geotechnical Solutions:
Structural Solutions: Adjacent T beams; MDcBc (Modular decked beam – Precast decked tub beam),
Grouted key closure joints
2011 – I-20 / LA 3249 (Well Road) Bridge
State: LA
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 85
Total Bridge Length (ft.): 260
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: SPMTs
Project Planning: Design-bid-build,
A+B bidding; Full lane closure; Lane rental
Geotechnical Solutions: CIP substructure under traffic,
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),
2011 – Salem Street Bridge Eastbound (93Fast14)
State: MA
Year: 2011
Owner: State
Location: Urban
Beam material: Steel
Spans: Three-span
Max Span Length (ft.): 78
Total Bridge Length (ft.): 160
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Other ABC Method
Project Planning: State process,
Early environmental clearance & permitting; Electronic shop drawing submittal & approval process,
Design-Build,
Full lane closure; Warranty; Incentive / disincentive clauses; No Excuse bonus; Value Engineering
Geotechnical Solutions: Reused Substructure/Foundation Unit,
Structural Solutions: MDcBs (modular concrete-decked steel beams),
CIP reinforced concrete closure joints; HESt-LSh concrete joints; Link slab; Asphalt overlay w/membrane
2011 – Mescal Road / J Six Ranch Road Bridge
State: AZ
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 55
Total Bridge Length (ft.): 220.67
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Early environmental clearance & permitting, Electronic shop drawing submittal & approval process,
Design-bid-build, Emergency contract,
Full lane closure, Accelerated bid process, Formalized partnering
Geotechnical Solutions:
Structural Solutions: Adjacent box beams,
Grouted key closure joints, PT ducts/un-bonded, Prefabricated railing