2012 – Rock County Road 55 Bridge over Railroad
State: MN
Year: 2012
Owner: Rock County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 82.5
Total Bridge Length (ft.): 82.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
Geotechnical Solutions: GRS IBS [Geosynthetic Reinforced Soil Integrated Bridge System],
Structural Solutions: adjacent box beams, GRS abutments,
asphalt overlay w/o membrane
2012 – Burnt River & UPRR Bridge
State: OR
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 160
Total Bridge Length (ft.): 160
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: State process,
Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT; MSE walls,
CIP reinforced concrete closure joints; Grouted blockout w/shear connectors; UHPC closure joints
2012 – OR213 Bridge over Washington Street (Jughandle)
State: OR
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 130
Total Bridge Length (ft.): 130
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide
Project Planning: State process,
Design-bid-build,
Full lane closure; Best value award
Geotechnical Solutions:
Structural Solutions: FDcBs (Full-width concrete-decked steel beam unit,
CIP reinforced concrete closure joints
2012 – I-95 Bridge over Hermitage Road
State: VA
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 207
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method
Project Planning: design-bid-build,
lane rental, Incentive / disincentive clauses, no excuse bonus, formalized partnering
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams),
CIP reinforced closure joints, grouted key closure joints, bars in splice couplers, PT ducts/bonded, match cast closure joint, epoxy joints, prefabricated railing
2011 – Boothbay Knickerbocker Bridge
State: ME
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 70
Total Bridge Length (ft.): 540
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: MDcBh (Modular concrete-Decked hybrid Beam - Hillman Composite Beam (HCB) w/ wings),
Asphalt overlay w/membrane
2011 – TH 61 Bridge over Gilbert Creek
State: MN
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 41
Total Bridge Length (ft.): 123
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
A+B bidding; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent inverted T beams; Precast pile caps; Precast abutment stems; Precast wingwalls,
CIP reinforced concrete closure joints; Socket connection (in precast substructure); Thin-bonded epoxy overlay
2011 – Buffalo Creek Bridge
State: SD
Year: 2011
Owner: Perkins County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 60
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee); Steel sheet piling; Other abutment element: precast planks,
Grouted key closure joints
2011 – UPRR Bridge 126.31
State: KS
Year: 2011
Owner: Union Pacific Railroad (UPRR)
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 29.83
Total Bridge Length (ft.): 150
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method
Project Planning: Design-Bid-Build,
Full lane closure (i.e., full track closure)
Geotechnical Solutions:
Structural Solutions: Adjacent box beams; Precast pile caps; Precast abutment cap w/backwall; Precast wingwalls,
Prefabricated railing
2011 – I-44 Bridge over Gasconade River
State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide
Project Planning: Design-bid-build,
A+B bidding; Full lane closure; Incentive / disincentive clauses; Contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),
2011 – I-5 / US 12 Bridge at Grand Mound
State: WA
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 88
Total Bridge Length (ft.): 176
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s),
CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms