Found 133 Results

2013 – Milton-Madison Bridge

State: IN
Year: 2013
Owner: States (Indiana and Kentucky)
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 727
Total Bridge Length (ft.): 3200
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide

Project Planning: design-build, full lane closure
Geotechnical Solutions: reused substructure/foundation unit, high-capacity pile, other foundation/wall: finite element analysis of existing pier caissons with passive soil resistance / scour mitigation,
Structural Solutions: MSE wall, truss span w/deck, CIP reinforced closure joint


2013 – I-84 Bridges over Dingle Ridge Road

State: NY
Year: 2013
Owner: State
Location: Urban
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 82
Total Bridge Length (ft.): 82
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Lateral Slide

Project Planning: design-bid-build, incentive / disincentive clause, value engineering
Geotechnical Solutions: CIP substructure under traffic (abutment drilled shafts constructed outside footprint of bridge),
Structural Solutions: MDcBc (Type D NEXT beams), precast wingwall, FDcBc (Full-width concrete-Decked concrete Beam unit - Type D NEXT beams), precast diaphragm, precast approach slab, other miscellaneous prefabricated element – precast sleeper slab, UHPC closure joint, asphalt overlay w/membrane


2012 – TH 53 Bridge over Paleface River

State: MN
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 75
Total Bridge Length (ft.): 75
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: full-depth precast deck panel w/PT, CIP reinforced closure joint, grouted key closure joint, PT ducts/bonded, thin-bonded epoxy overlay


2012 – Route 202 Bridge over Passaic River

State: NJ
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 92
Total Bridge Length (ft.): 92
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams), precast abutment cap, precast backwall, precast wingwall, CIP reinforced closure joint, socket connection (in precast substructure), asphalt overlay w/o membrane, precast approach slab, prefabricated railing, other miscellaneous element – precast sleeper slab


2012 – Rock County Road 55 Bridge over Railroad

State: MN
Year: 2012
Owner: County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 82.5
Total Bridge Length (ft.): 82.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build,
Geotechnical Solutions: GRS IBS [Geosynthetic Reinforced Soil Integrated Bridge System],
Structural Solutions: adjacent box beam, GRS abutment, asphalt overlay w/o membrane


2012 – OR213 Bridge over Washington Street (Jughandle)

State: OR
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 130
Total Bridge Length (ft.): 130
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide

Project Planning: State process, design-bid-build, full lane closure, best value award, other contracting - A+C+D bidding (A C D bidding)
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit), CIP reinforced closure joint


2012 – Montour Run Bridge No. 6

State: PA
Year: 2012
Owner: Allegheny County
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 47.8
Total Bridge Length (ft.): 47.8
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Other ABC Method

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: steel grid (concrete filled) deck, precast abutment cap w/backwall, FDcBs (full-width concrete-decked steel beam), precast curb, LWC deck, other miscellaneous prefabricated element – precast moment slab


2012 – Maryland Avenue Bridge

State: MN
Year: 2012
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 102.75
Total Bridge Length (ft.): 210.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: SPMTs

Project Planning: design-build, full lane closure, best value award
Geotechnical Solutions: EPS geofoam
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit}, thin-bonded epoxy overlay


2012 – I-95 Bridge over Hermitage Road

State: VA
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 207
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: design-bid-build, lane rental, incentive / disincentive clause, no excuse bonus, formalized partnering
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams), CIP reinforced closure joint, grouted key closure joint, bars in splice coupler, PT ducts/bonded, match cast closure joint, epoxy joint, prefabricated railing


2012 – Burnt River & UPRR Bridge

State: OR
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 160
Total Bridge Length (ft.): 160
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: State process, Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT; MSE walls, CIP reinforced concrete closure joints; Grouted blockout w/shear connectors; UHPC closure joints