8 bridges found
  • image
    2011 - I-84 Bridge F-114
      State: Utah ;    Year: 2011 ;    Location: On I-84 in Morgan County 0.8 miles east of the community of Taggart, northeast of Salt Lake City ;    Spans: Three-span ;    Dimensions: Twin 147-ft long and 35-ft wide three-span (55.83 ft – 48.67 ft – 42.17 ft) prestressed concrete I-beam bridge; 49º skew; 1432.39-ft horizontal curve radius ;    Beam Material: Concrete ;    Structural Solutions: Full-depth precast deck panel w/o PT; Grouted key closure joint; Grouted blockout w/shear connectors; Asphalt overlay w/membrane; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; Design-bid-build; A+B+C bidding; Lane rental; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    2011 - I-15 / Sam White Lane Bridge
      State: Utah ;    Year: 2011 ;    Location: On Sam White Lane over I-15 in the city of American Fork in Utah County, 30 miles south of Salt Lake City ;    Spans: Two-span ;    Dimensions: 354-ft long and 76.8-ft wide two-span continuous steel plate-girder bridge (177 ft – 177 ft) roll-in; 48º skew; 1,910-ton self-weight ;    Beam Material: Steel ;    Structural Solutions: ; FDcBs (full-width concrete-decked steel beam unit); CIP reinforced concrete closure joints; Thin-bonded epoxy overlay; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; Design-build; Full lane closure ;    Construction Equipment: SPMT(s)
  • image
    2010 - I-70 Bridge over Eagle Canyon (Eastbound)
      State: Utah ;    Year: 2010 ;    Location: Mile Post 118 between Salina and Green River in southern Utah ;    Spans: > Three-span ;    Dimensions: 491-ft long, 34-ft wide deck truss bridge with 375-ft main span ;    Beam Material: Steel ;    Structural Solutions: Full-depth precast deck panel w/PT; Grouted key closure joint; PT ducts/bonded; Thin-bonded epoxy overlay; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; CMGC; Full lane closure ;    Construction Equipment: High-capacity crane(s)
  • image
    2010 - I-15 / Layton Parkway Bridge
      State: Utah ;    Year: 2010 ;    Location: Over I-15 in the city of Layton in Davis County, north of Salt Lake City ;    Spans: Two-span ;    Dimensions: 217.8-ft long and 134.3-ft wide two-span steel girder bridge longitudinal launch; 1,050-ton 108.8-ft-long span self-weight, 1,050-ton 106.0-ft-long span self-weight ;    Beam Material: Steel ;    Structural Solutions: MSE walls; FDcBs (full-width concrete-decked steel beam unit); CIP reinforced concrete closure joints; Thin-bonded epoxy overlay; LWC deck ;    Geotechnical Solutions: ; Embankment surcharge ;    Project Planning: State process; Design-build; Incentive / disincentive clauses ;    Construction Equipment: Longitudinal launch w/pad (skids)
  • image
    2010 - I-15 / Pioneer Crossing Bridge
      State: Utah ;    Year: 2010 ;    Location: Pioneer Crossing over I-15 in American Fork, south of Salt Lake City ;    Spans: One-span ;    Dimensions: 191-ft long and 69-ft wide single-span bridge roll-in; 2,300-ton self-weight (longest and heaviest multi-girder spans moved with SPMTs in the US to date) ;    Beam Material: Concrete ;    Structural Solutions: MSE walls; FDcBc (full-width concrete-decked concrete beam unit); CIP reinforced concrete closure joints ;    Geotechnical Solutions: ; Embankment surcharge ;    Project Planning: State process; Design-build; Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: SPMT(s)
  • image
    2009 - I-80 Bridge over 2300 East
      State: Utah ;    Year: 2009 ;    Location: Salt Lake City ;    Spans: One-span ;    Dimensions: 80-ft long and 62.83-ft wide single-span bridge slide-in; 650-ton self-weight ;    Beam Material: Concrete ;    Structural Solutions: ; FDcBc (full-width concrete-decked concrete beam unit); Precast approach slabs; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; Design-build (low bid); Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: Lateral slide w/pad (skids)
  • image
    2008 - Riverdale Road Bridge over I-84
      State: Utah ;    Year: 2008 ;    Location: Riverdale Road over I-84 in the city of Riverdale in Weber County ;    Spans: Two-span ;    Dimensions: 155.5-ft-long and 170.83-ft-wide two-span steel plate-girder bridge (76.5 ft – 76.5 ft); 5º skew ;    Beam Material: Steel ;    Structural Solutions: Full-depth precast deck panel w/PT; Precast cap & column(s); Precast abutment stems; MSE wall; CIP reinforced concrete closure joint; Grouted key closure joint; PT ducts/bonded; Match cast closure joint; Epoxy joint; Polymer concrete overlay; Precast approach slab; Precast diaphragm ;    Geotechnical Solutions: ; Lightweight fill ;    Project Planning: State process; CMGC; Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    2007 - I-215 / 4500 South Bridge
      State: Utah ;    Year: 2007 ;    Location: 4500 South (SR-266) over I-215 in Salt Lake City ;    Spans: One-span ;    Dimensions: 172-ft long and 82-ft wide single-span bridge roll-in; 1,600-ton self-weight ;    Beam Material: Concrete ;    Structural Solutions: ; FDcBs (full-width concrete-decked steel beam unit); Precast approach slab; LWC deck ;    Geotechnical Solutions: CIP substructure under traffic; Self-compacting backfill ;    Project Planning: State process; CMGC; Full lane closure ;    Construction Equipment: SPMT(s)