ABC Project Database

5 bridges found
  • image
    2010 - Biltmore Avenue Bridge
      State: North Carolina ;    Year: 2010 ;    Location: On Biltmore Avenue (NC 81, an urban minor arterial) over the Swannanoa River in Biltmore Village in Buncombe County ;    Spans: One-span ;    Dimensions: 135-ft-long and 72.5-ft wide single-span modular decked beam bridge ;    Beam Material: Steel ;    Structural Solutions: MDcBs (Modular decked beams); CIP reinforced concrete closure joints ;    Geotechnical Solutions: • Micropiles ;    Project Planning: ; • Design-Bid-Build; • Full lane closure ;    Construction Equipment: Conventional
  • image
    2010 - US 17 Bridge over Tar River (Washington Bypass)
      State: North Carolina ;    Year: 2010 ;    Location: US Highway 17 over the Pamlico-Tar River and environmentally sensitive wetlands near the city of Washington, North Carolina in Beaufort County ;    Spans: > Three-span ;    Dimensions: 2.8-mile-long and 70-ft-wide (typical clear roadway width) 128-span prestressed bulb-tee girder bridge (typical 121-ft-long spans, with spans ranging from 100 ft to 121.67 ft) ;    Beam Material: Concrete ;    Structural Solutions: Precast pile caps; PT ducts/bonded; Socket connection (in precast substructure) ;    Geotechnical Solutions: ;    Project Planning: ; Design-build; Full lane closure; Incentive / disincentive clauses; Formalized partnering ;    Construction Equipment: Gantry system
  • image
    2008 - NC 12 Bridge over Molasses Creek
      State: North Carolina ;    Year: 2008 ;    Location: North Carolina Highway 12 (NC 12) over Molasses Creek on Ocracoke Island in Hyde County ;    Spans: > Three-span ;    Dimensions: 252-ft-long and 36-ft-wide five-span adjacent prestressed cored slab beam bridge (51 ft - 50 ft - 50 ft - 50 ft - 51 ft) ;    Beam Material: Concrete ;    Structural Solutions: Adjacent slab beams; Precast pile caps; Precast abutment caps; Precast backwalls; Precast wingwalls; Precast abutment footing; Grouted key closure joint; PT ducts/un-bonded; Socket connection (in precast caps); Grouted duct connection (in precast backwalls); Asphalt overlay w/o membrane; Prefabricated railing ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure; Incentive / disincentive clauses; Lump sum bonus; Contractor revision ;    Construction Equipment: Conventional
  • image
    1999 - Beaufort and Morehead Railroad Trestle Bridge
      State: North Carolina ;    Year: 1999 ;    Location: US Highway 70 over Newport River between Morehead City and Radio Island in Carteret County ;    Spans: > Three-span ;    Dimensions: 495-ft-long (15 spans @ 33 ft) 12-ft-wide prestressed concrete adjacent T beam trestle-span approaches on the west side of the bascule span and 1,749-ft-long (53 spans @ 33 ft) 12-ft-wide prestressed concrete tee-beam trestle-span approaches on the east side of ;    Beam Material: Concrete ;    Structural Solutions: Adjacent T beams; Precast pile caps; Precast abutment caps; Precast backwalls; Precast wingwalls; Pocket connection (in precast substructure); Prefabricated railing; Other miscellaneous element – precast flat slab transition spans and thrust block ribs ;    Geotechnical Solutions: ;    Project Planning: ; Design-build; Full lane closure (i.e., full track closure) ;    Construction Equipment: Conventional
  • image
    1983 - Linn Cove Viaduct
      State: North Carolina ;    Year: 1983 ;    Location: Blue Ridge Parkway, Milepost 304.6, crossing Grandfather Mountain in Avery County ;    Spans: > Three-span ;    Dimensions: 1,243-ft-long and 37.5-ft-wide 8-span precast concrete segmental bridge (98.5 ft – 163.0 ft – 4 @ 180 ft – 163 ft – 98.5 ft); curved alignment ;    Beam Material: Concrete ;    Structural Solutions: Precast segmental beam elements; Precast column(s); PT ducts/bonded ;    Geotechnical Solutions: Micropiles ;    Project Planning: FHWA Process; Design-Bid-Build ;    Construction Equipment: High-capacity crane(s)