7 bridges found
  • image
    Franklin Avenue Bridge Rehabilitation
      State: Minnesota ;    Year: 2016 ;    Location: Over Mississippi River and West River Pkwy and intersecting East River Pkwy in the city of Minneapolis in Hennepin County ;    Spans: > Three-span ;    Dimensions: 1049.94-ft-long and 66.3 to 76.3-ft-wide 5-span open spandrel concrete deck arch bridge (55.42 ft, 199.00 ft, 400.00 ft, 199.00 ft, 55.42 ft); 0º skew ;    Beam Material: Concrete ;    Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Column Cap (Precast Spandrel Cap Beams), Precast Abutment Cap; UHPC Closure Joint, Polymer Concrete Overlay, Precast Approach Slab, Prefabricated Railing (Ornamental Rail Panels) ;    Geotechnical Solutions: ;    Project Planning: Benefit/Cost Method; Programmatic Agreements, Early Environmental Clearance and Permitting; Design-Bid-Build; Incentive / Disincentive Clause ;    Construction Equipment: High-Capacity Crane(s), High-Capacity Crane on Barge
  • image
    Larpenteur Avenue Bridge
      State: Minnesota ;    Year: 2014 ;    Location: on Larpenteur Avenue over Interstate 35E in the city of Saint Paul in Ramsey County ;    Spans: Two-span ;    Dimensions: 187.1-ft-long and 75.8-ft-wide 2-span prestressed concrete I beam bridge (91.2 ft – 91.2 ft); no skew ;    Beam Material: Concrete ;    Structural Solutions: ; FDcBc {Full-Width concrete-Decked concrete Beam Unit}; Thin-Bonded Epoxy Overlay ;    Geotechnical Solutions: ;    Project Planning: ; Design-Build; Best Value Award ;    Construction Equipment: Lateral Slide w/pad
  • image
    TH 36 over Keller Lake Bridge
      State: Minnesota ;    Year: 2013 ;    Location: On State Highway 36 from Arcade Street to State Highway 61 southbound exit ramp in the city of Maplewood in Ramsey County ;    Spans: Three-span ;    Dimensions: 118.1-ft-long and 89.8-ft-wide 3-span prestressed inverted tee bridge (34.75 ft – 46.5 ft – 34.75 ft); 0º skew ;    Beam Material: Concrete ;    Structural Solutions: precast pile caps; precast abutment stems; precast wingwalls; adjacent inverted T beams; socket connection (in precast substructure) ;    Geotechnical Solutions: ;    Project Planning: ; design-bid-build; incentive / disincentive clause ;    Construction Equipment: conventional
  • image
    2012 - TH 53 Bridge over Paleface River
      State: Minnesota ;    Year: 2012 ;    Location: State Highway 53 over Paleface River in St. Louis County near the town of Cotton, in northern Minnesota ;    Spans: One-span ;    Dimensions: 75-ft-long and 45-ft-wide single-span prestressed I-beam bridge ;    Beam Material: Concrete ;    Structural Solutions: Full-depth precast deck panel w/PT; CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Thin-bonded epoxy overlay ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    Maryland Avenue Bridge
      State: Minnesota ;    Year: 2012 ;    Location: on Maryland Avenue over Interstate 35E in the city of Saint Paul in Ramsey County ;    Spans: Two-span ;    Dimensions: 210.5-ft-long and 121.3-ft-wide 2-span prestressed concrete I beam bridge (102.75 ft – 102.75 ft); 8º skew ;    Beam Material: Concrete ;    Structural Solutions: ; FDcBc {Full-Width concrete-Decked concrete Beam Unit}; thin-bonded epoxy overlay ;    Geotechnical Solutions: ; EPS geofoam ;    Project Planning: ; design-build; best value award ;    Construction Equipment: SPMT(s)
  • image
    Rock County Road 55 Bridge over Railroad
      State: Minnesota ;    Year: 2012 ;    Location: 0.1 Miles South of JCT. C.S.A.H. 4 on C.R. 55 over Minnesota southern railway in Magnola Township of Rock County ;    Spans: One-span ;    Dimensions: 82.5-ft-long and 33-ft-wide one-span prestressed concrete side-by-side box beams, 0º skew ;    Beam Material: Concrete ;    Structural Solutions: Adjacent box beams, GRS abutments ;    Geotechnical Solutions: GRS IBS [Geosynthetic Reinforced Soil Integrated Bridge System] ;    Project Planning: ; design-bid-build ;    Construction Equipment: conventional
  • image
    2011 - TH 61 Bridge over Gilbert Creek
      State: Minnesota ;    Year: 2011 ;    Location: Trunk Highway 61 over Gilbert Creek in Goodhue County near Lake City in southeastern Minnesota ;    Spans: Three-span ;    Dimensions: 123-ft-long and 76.66-ft-wide three-span Precast Composite Slab Span (PCSS) bridge (40 ft – 41 ft – 40 ft) ;    Beam Material: Concrete ;    Structural Solutions: Adjacent inverted T beams; Precast pile caps; Precast abutment stems; Precast wingwalls; CIP reinforced concrete closure joints; Socket connection (in precast substructure); Thin-bonded epoxy overlay ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; A+B bidding; Incentive / disincentive clauses ;    Construction Equipment: Conventional