    2009 - I-80 Bridge over 2300 East
      State: Utah ;    Year: 2009 ;    Location: Salt Lake City ;    Spans: One-span ;    Dimensions: 80-ft long and 62.83-ft wide single-span bridge slide-in; 650-ton self-weight ;    Beam Material: Concrete ;    Structural Solutions: ; FDcBc (full-width concrete-decked concrete beam unit); Precast approach slabs; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; Design-build (low bid); Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: Lateral slide w/pad (skids)
  • image
    2009 - CTH B Bridge over Parsons Creek
      State: Wisconsin ;    Year: 2009 ;    Location: County Trunk Highway (CTH) B over Parsons Creek near the city of Fond du Lac in Fond du Lac County ;    Spans: One-span ;    Dimensions: 21.67-ft long and 40-ft wide single-span precast 3-sided culvert bridge ;    Beam Material: Concrete ;    Structural Solutions: Precast 3-sided culvert; Precast wingwalls; Grouted key closure joints ;    Geotechnical Solutions: ;    Project Planning: ; In-house force: county crews; Full lane closure ;    Construction Equipment: Conventional
  • image
    2009 - Inyan Kara Creek Bridge
      State: Wyoming ;    Year: 2009 ;    Location: on County Road 268 over Inyan Kara Creek in Crook County in northeastern Wyoming ;    Spans: One-span ;    Dimensions: 85-ft long and 29.33-ft wide single-span prestressed deck bulb T girder bridge ;    Beam Material: Concrete ;    Structural Solutions: Adjacent deck bulb T beams; Precast abutment caps; Precast backwalls; Precast wingwalls; Grouted key closure joints ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure ;    Construction Equipment: Conventional
  • image
    2009 - Route 31 Bridge over Canandaigua Outlet
      State: New York ;    Year: 2009 ;    Location: NYS Route 31 in the village of Lyons in Wayne County ;    Spans: One-span ;    Dimensions: 87.42-ft long and 42.75-ft wide single-span prestressed concrete adjacent deck bulb-tee beam bridge; skewed ;    Beam Material: Concrete ;    Structural Solutions: Adjacent deck bulb T beams; CIP reinforced closure joints, UHPC closure joints, asphalt overlay w/membrane ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build ;    Construction Equipment: Conventional
  • image
    Route 23 Bridge over Otego Creek
      State: New York ;    Year: 2009 ;    Location: NYS Route 23 in Otsego County near the village of Oneonta ;    Spans: One-span ;    Dimensions: 131.2-ft long and 42.7-ft wide single-span steel plate girder bridge ;    Beam Material: Steel ;    Structural Solutions: Full-depth precast deck panel w/o PT (with UHPC closure joints); CIP reinforced closure joints, UHPC closure joints, standard concrete overlay ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build ;    Construction Equipment: Conventional
  • image
    2008 - Hardscrabble Creek Bridge
      State: California ;    Year: 2008 ;    Location: US 199 over Hardscrabble Creek between Hiouchi and Gasquet in Del Norte County ;    Spans: One-span ;    Dimensions: 133.5-ft-long and 43-ft-wide single-span prestressed multi-cell box girder bridge; 900-ton lateral slide ;    Beam Material: Concrete ;    Structural Solutions: ; Prestressed multi-cell box girder span ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure ;    Construction Equipment: Lateral slide w/pad (skids)
  • image
    2008 - I-85 / Kia Boulevard Bridge
      State: Georgia ;    Year: 2008 ;    Location: CR 98 (Kia Boulevard) over I-85 in Troup County in west central Georgia ;    Spans: > Three-span ;    Dimensions: 384-ft-long and 119.25-ft-wide four-span prestressed bulb tee girder bridge (60 ft – 132 ft – 132 ft – 60 ft) ;    Beam Material: Concrete ;    Structural Solutions: Precast cap & column(s); Bars in splice couplers; Grouted duct connection (in precast substructure) ;    Geotechnical Solutions: ;    Project Planning: ; Design-build; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    2008 - 24th Street Bridge over I-29/I-80
      State: Iowa ;    Year: 2008 ;    Location: on 24th Street over I-29/I-80 in the city of Council Bluffs in Pottawattamie County ;    Spans: Two-span ;    Dimensions: 353.5-ft-long and 105.67-ft wide two-span bridge (178.5 ft - 175.0 ft) ;    Beam Material: Steel ;    Structural Solutions: Full-depth precast deck panel w/PT; CIP reinforced concrete closure joints; Grouted key closure joints; Grouted blockout w/shear connectors; PT ducts/bonded; Standard concrete overlay ;    Geotechnical Solutions: ; Fully-contained flooded backfill ;    Project Planning: ; Design-bid-build; A+B bidding; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    2008 - Jakway Park Bridge
      State: Iowa ;    Year: 2008 ;    Location: 136th Street over the east branch of Buffalo Creek in northeast Buchanan County ;    Spans: Three-span ;    Dimensions: 115.33-ft long and 24.75-ft wide three-span ultra-high-performance concrete (UHPC) pi-girder bridge (30.58 ft – 51.17 ft – 30.58 ft) [ pi-girder in center span only] • Rural location ;    Beam Material: Concrete ;    Structural Solutions: Other deck beam element: pi-girders; CIP reinforced concrete closure joints; Grouted key closure joints; Asphalt chip seal w/o membrane; Steel diaphragms ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure ;    Construction Equipment: Conventional
  • image
    2008 - MD 28 Bridge over Washington Run
      State: Maryland ;    Year: 2008 ;    Location: on MD Route 28 over Washington Run along the Potomac River in southern Frederick County near the community of Point of Rocks ;    Spans: One-span ;    Dimensions: 40-ft-long and 41-ft-wide single-span prestressed concrete slab beam bridge; 14º skew ;    Beam Material: Concrete ;    Structural Solutions: Adjacent slab beams; Grouted key closure joints; PT ducts/bonded; Standard concrete overlay ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: Conventional