2011 – US 6 Bridge over Keg Creek
State: IA
Year: 2011
Owner: State
Location: Rural
Beam material: Steel
Spans: Three-span
Max Span Length (ft.): 70
Total Bridge Length (ft.): 204.5
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: TPF-5(221),
Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions: Fully-contained flooded backfill
Structural Solutions: MDcBs (Modular decked beams); Precast cap & column(s); Precast backwalls; Precast wingwalls,
CIP reinforced concrete closure joints; Bars in splice couplers; Socket connection (in precast substructure)-(abutments); UHPC closure joints; Precast approach slab; Prefabricated railing
2011 – Little Cedar Creek Bridge
State: IA
Year: 2011
Owner: County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 60
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure
Geotechnical Solutions: fully-contained flooded backfill
Structural Solutions: UHPC waffle deck,
CIP reinforced closure joints, grouted blockout w/shear connectors, UHPC closure joints
2009 – 640th Street Bridge over Branch Raccoon River
State: IA
Year: 2009
Owner: County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 50.83
Total Bridge Length (ft.): 50.83
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure, incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: adjacent box beams, precast abutment caps, precast backwalls, precast wingwalls,
grouted key closure joints, socket connection (in precast substructure), epoxy joints
2008 – 24th Street Bridge over I-29/I-80
State: IA
Year: 2008
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 178.5
Total Bridge Length (ft.): 353.5
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
A+B bidding; Incentive / disincentive clauses
Geotechnical Solutions: Fully-contained flooded backfill
Structural Solutions: Full-depth precast deck panel w/PT,
CIP reinforced concrete closure joints; Grouted key closure joints; Grouted blockout w/shear connectors; PT ducts/bonded; Standard concrete overlay
2008 – Jakway Park Bridge
State: IA
Year: 2008
Owner: Buchanan County
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 51.17
Total Bridge Length (ft.): 115.33
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Other deck beam element: pi-girders,
CIP reinforced concrete closure joints; Grouted key closure joints; Asphalt chip seal w/o membrane; Steel diaphragms
2007 – IA – Madison County Bridge
State: IA
Year: 2007
Owner: Madison County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 46.67
Total Bridge Length (ft.): 46.67
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent box beams; Precast abutment cap,
CIP reinforced concrete closure joints; Grouted key closure joint; PT ducts/bonded; Socket connection (in precast substructure)-(caps)
2006 – Mackey Bridge (Marsh Rainbow Arch Bridge)
State: IA
Year: 2006
Owner: Boone County
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 56.5
Total Bridge Length (ft.): 155.33
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT; Precast pile caps; Precast abutment footings,
CIP reinforced concrete closure joints; Bars in splice couplers; PT ducts/bonded; Socket connection (in precast substructure); Other closure joint/connection: grouted channel w/ shear connectors