ABC Decision Making and Economic Modeling Tool TPF-5(221) - 1

Accelerated Bridge Construction Decision Making and Economic Modeling Tool, TPF-5(221)

Category: Completed Projects
Group: Design-Making Tools
Subject: AHP
Key Words: Accelerated Bridge Construction, Decision Making, AHP, Criteria Hierarchy

Budget: 120000.00
Project Length: 18
Start Date: 2009
Completion Date: 2011


Accelerated Construction Decision-Making Process for Bridges

Category: Completed Projects
Group: Design-Making Tools
Subject: AHP
Key Words:

Accelerated Construction, Bridges, Analytical Hierarchy Process, Decision Making System


Budget: 143058.00
Project Length: 12
Start Date: 2004
Completion Date: 2005


Framework for Prefabricated Bridge Elements and Systems (PBES) Decision Making

Category: Completed Projects
Group: Design-Making Tools
Subject: FHWA
Key Words:

Budget: 0.00
Project Length: 0
Start Date: 2004
Completion Date: 2006


Development, Characterization and Applications of Non-Proprietary Ultra High Performance Concretes for Highway Bridges

Category: Ongoing Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: Alternative to UHPC
Key Words:

Bridge construction; Bridge members; Compressive strength; Concrete bridges; Cracking; Energy absorption; High performance concrete; Mechanical properties; Tensile strength; Ultra high performance concrete


Budget: 311125.00
Project Length: 48
Start Date: 2013
Completion Date: 2017


Compression Response of a rapid-strengthening UHPC Formulation

Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: High Early UHPC
Key Words:

Budget: 0.00
Project Length: 0
Start Date: 2012
Completion Date: 0


Column Base Pipe Pins

Category: Ongoing Projects
Group: Seismic
Subject: Columns
Key Words:

Budget: 280.00
Project Length: 0
Start Date: 2012
Completion Date: 0


Column Pile Shaft Pin Connections

Category: Ongoing Projects
Group: Seismic
Subject: Columns
Key Words:

Budget: 0.00
Project Length: 0
Start Date: 2016
Completion Date: 0


Seismic Performance of Concrete Filled Steel Tube (CFST) Bridge Columns For Accelerated Bridge Construction

Category: Completed Projects
Group: Seismic
Subject: CFST
Key Words:

Bridge construction; Bridge design; Bridge piers; Columns; Concrete; Earthquake resistant design


Budget: 35124.00
Project Length: 49
Start Date: 2012
Completion Date: 2016


Design and Performance Verification of a Bridge Column/Footing/Pile System for Accelerated Bridge Construction (ABC), TR-673

Category: Ongoing Projects
Group: Substructure
Subject: Footing/Column/Cap
Key Words:

Bridge construction, Bridge design, Prefabricated bridges, Service life, Bridge abutments, Columns, Footings,Bridge superstructures, State departments of transportation, Iowa


Budget: 214552.00
Project Length: 30
Start Date: 2014
Completion Date: 2016


Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects

Category: Completed Projects
Group: Substructure
Subject: Grouted Couplers, Non-seismic
Key Words:

ABC connection details, accelerated bridge construction, chloride penetration testing, fatigue load testing, grouted coupler connections, Keg Creek Bridge, precast concrete bridges, static load testing


Budget: 49986.00
Project Length: 24
Start Date: 2012
Completion Date: 2014