In-Service Performance Evaluation and Monitoring of the Hybrid Composite Beam Bridge System
Category: Completed Projects
Group: Superstructure
Subject: Composites
Key Words:
Bridge construction; Bridges; Composite structures; Fabrication; Inspection; Live loads; Performance evaluations
Budget: 102000.00
Project Length: 24
Start Date: 2012
Completion Date: 2013
Evaluation and Analysis of Decked Bulb T Beam Bridge
Category: Completed Projects
Group: Superstructure
Subject: Decked Bulb Ts
Key Words:
Decked bulb T beam, bridges, transverse post- tensioning, longitudinal cracks, transverse diaphragms, ultra high performance concrete. CFRP prestressing strands, Un-bonded strands
Budget: 415000.00
Project Length: 36
Start Date: 2011
Completion Date: 2015
Investigation of Techniques for Accelerating the Construction of Bridge Deck Overlays
Category: Completed Projects
Group: Decks
Subject: Deck Overlays
Key Words: bridge deck overlays, bridge deck rehabilitation, bridge service life, overlay construction time, overlay curing time
Budget: 50000.00
Project Length: 24
Start Date: 2014
Completion Date: 2016
Long-Term Performance Evaluation of NUDECK
Category: Ongoing Projects
Group: Decks
Subject: Deck Panels
Key Words:
Bridge decks, Precast concrete, Prestressed concrete bridges, Girders, Posttensioning, Inspection, Service life,Nebraska
Budget: 109007.00
Project Length: 36
Start Date: 2013
Completion Date: 2016
Innovative Modular High Performance Lightweight Decks for Accelerated Bridge Construction
Category: Completed Projects
Group: Decks
Subject: Deck Panels
Key Words:
Bridge decks, Load factor, Bridge construction, Defects, Aging infrastructure, Service life, High performance concrete, Fiber reinforced polymers, Lightweight materials
Budget: 180000.00
Project Length: 18
Start Date: 2013
Completion Date: 2015
Transverse Joint Configuration Development and Testing for a Modular Bridge Deck Replacement
Category: Completed Projects
Group: Decks
Subject: Deck Panels
Key Words:
Modular structures, Bridge decks, Bridge construction, Transverse joints, Structural health monitoring, Shear strength,
Budget: 151000.00
Project Length: 36
Start Date: 2008
Completion Date: 2011
Simplified Full-Depth Precast Concrete Deck Panel Systems; NCHRP Project 12-96
Category: Completed Projects
Group: Decks
Subject: Deck Panels
Key Words:
Budget: 400000.00
Project Length: 36
Start Date: 2013
Completion Date: 2016
Evaluation of Accelerated Bridge Construction (ABC) – A Forensic Analysis (on deck panels)
Category: Ongoing Projects
Group: Decks
Subject: Shear Studs for Panels
Key Words:
Budget: 0.00
Project Length: 0
Start Date: 2013
Completion Date: 0
Optimized Shear Stud Spacing for Precast Deck Panel Construction
Category: Ongoing Projects
Group: Decks
Subject: Shear Studs for Panels
Key Words:
composite,construction,Infrastructure,Research studs,Fatigue,Steel bridges, Bridge construction,Superstructures
Budget: 0.00
Project Length: 43
Start Date: 2011
Completion Date: 2015
Sandwich Panel Steel Deck System
Category: Ongoing Projects
Group: Decks
Subject: Sandwich Panel System
Key Words:
Bridge construction; Bridge decks; Bridge superstructures; Girder bridges;Lightweight materials; Steel bridges
Budget: 133326.00
Project Length: 36
Start Date: 2010
Completion Date: 2010