Full Depth Precast Concrete Bridge Deck Panel Systems, NCHRP 12-65, Report 584

Category: Completed Projects
Group: Decks
Subject: Deck Panels
Key Words:

Budget: 0.00
Project Length: 0
Start Date: 2004
Completion Date: 2006


SHRP2 R04: Innovative Bridge Designs for Rapid Renewal

Category: Completed Projects
Group: Standards
Subject: Short to Medium Spans
Key Words:

Bridge construction; Bridge design; Design methods; Highway bridges; Pilot studies; Standardization


Budget: 0.00
Project Length: 0
Start Date: 2016
Completion Date: 2013


Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges

Category: Completed Projects
Group: Standards
Subject: Off-System Structures
Key Words:

Accelerated bridge construction, Prestressed concrete, Precast bridges


Budget: 0.00
Project Length: 0
Start Date: 2012
Completion Date: 2012


Evaluation of the Buena Vista IBRD Bridge: A Furthering of Accelerated Bridge Construction in Iowa

Category: Completed Projects
Group: Standards
Subject: Precast Cap Beams, Backwalls, Box Beams
Key Words:

Accelerated Bridge construction, box girder bridges, bridge design, bridge structures, innovative bridge construction precast bridge components rapid bridge construction single span precast structural performance


Budget: 0.00
Project Length: 37
Start Date: 2008
Completion Date: 2011


Precast Concrete Elements for Accelerated Bridge Construction

Category: Completed Projects
Group: Standards
Subject: In-service Testing Pile Pockets, Deck Panels,
Key Words:

Bridge abutments; Bridge decks; Bridge substructures; Concrete bridges; Field tests; Girders; Laboratory tests; Posttensioning; Precast concrete; Prestressed concrete; Shear strength


Budget: 0.00
Project Length: 30
Start Date: 2006
Completion Date: 2009


Evaluation of a Bridge Constructed Using Accelerated Construction Practices

Category: Completed Projects
Group: Standards
Subject: In-service Testing Pile Pockets, Deck Panels,
Key Words:

Acceleration (Mechanics); Behavior; Bridge engineering; Bridges; Construction; Long span bridges; Performance tests; Research projects


Budget: 0.00
Project Length: 0
Start Date: 2006
Completion Date: 2008


Laboratory and Field Testing and Evaluation of Precast Bridge Elements

Category: Completed Projects
Group: Standards
Subject: In-service Testing Pile Pockets, Deck Panels,
Key Words:

Bridge design; Bridge engineering; Construction; Cost effectiveness; Design standards; Durability; Field tests; Laboratory tests; Precast concrete; Research projects; Structural tests


Budget: 0.00
Project Length: 0
Start Date: 2006
Completion Date: 2009


Best Practices Regarding Performance of ABC Connections in Bridges Subject to Multihazard and Extreme Events NCHRP 20-68A, Scan 11-02

Category: Completed Projects
Group: Synthesis
Subject: Connections
Key Words:

Best practices; Blast loads; Bridge construction; Bridge members; Design load; Earthquakes; Elastic waves; Prefabricated bridges; Storm surges; Structural connection; Tidal waves; Water waves; Wind


Budget: 0.00
Project Length: 0
Start Date: 2016
Completion Date: 2012


Best Practices in Accelerated Construction Techniques; NCHRP 20-68A, Scan 07-02

Category: Completed Projects
Group: Synthesis
Subject: Emergency, Non-Emergency
Key Words:

Best practices; Construction management; Construction projects; Contractors; Cooperation; Design; Partnerships; Project delivery; Road construction


Budget: 0.00
Project Length: 0
Start Date: 2007
Completion Date: 2009


Improving Bridges with Prefabricated Precast Concrete Systems

Category: Completed Projects
Group: Design-Making Tools
Subject: MIDOT/AHP, PBES, Connections, Grouts, DMT, Means/Methods
Key Words:

Bridge construction; Cement grouts; Concrete bridges; Decision support systems; Precast concrete; Prefabricated bridges; State of the practice; Structural connection


Budget: 0.00
Project Length: 14
Start Date: 2010
Completion Date: 2013