Full Depth Precast Concrete Bridge Deck Panel Systems, NCHRP 12-65, Report 584
Category: Completed Projects
Group: Decks
Subject: Deck Panels
Key Words:
Budget: 0.00
Project Length: 0
Start Date: 2004
Completion Date: 2006
SHRP2 R04: Innovative Bridge Designs for Rapid Renewal
Category: Completed Projects
Group: Standards
Subject: Short to Medium Spans
Key Words:
Bridge construction; Bridge design; Design methods; Highway bridges; Pilot studies; Standardization
Budget: 0.00
Project Length: 0
Start Date: 2016
Completion Date: 2013
Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges
Category: Completed Projects
Group: Standards
Subject: Off-System Structures
Key Words:
Accelerated bridge construction, Prestressed concrete, Precast bridges
Budget: 0.00
Project Length: 0
Start Date: 2012
Completion Date: 2012
Evaluation of the Buena Vista IBRD Bridge: A Furthering of Accelerated Bridge Construction in Iowa
Category: Completed Projects
Group: Standards
Subject: Precast Cap Beams, Backwalls, Box Beams
Key Words:
Accelerated Bridge construction, box girder bridges, bridge design, bridge structures, innovative bridge construction precast bridge components rapid bridge construction single span precast structural performance
Budget: 0.00
Project Length: 37
Start Date: 2008
Completion Date: 2011
Precast Concrete Elements for Accelerated Bridge Construction
Category: Completed Projects
Group: Standards
Subject: In-service Testing Pile Pockets, Deck Panels,
Key Words:
Bridge abutments; Bridge decks; Bridge substructures; Concrete bridges; Field tests; Girders; Laboratory tests; Posttensioning; Precast concrete; Prestressed concrete; Shear strength
Budget: 0.00
Project Length: 30
Start Date: 2006
Completion Date: 2009
Evaluation of a Bridge Constructed Using Accelerated Construction Practices
Category: Completed Projects
Group: Standards
Subject: In-service Testing Pile Pockets, Deck Panels,
Key Words:
Acceleration (Mechanics); Behavior; Bridge engineering; Bridges; Construction; Long span bridges; Performance tests; Research projects
Budget: 0.00
Project Length: 0
Start Date: 2006
Completion Date: 2008
Laboratory and Field Testing and Evaluation of Precast Bridge Elements
Category: Completed Projects
Group: Standards
Subject: In-service Testing Pile Pockets, Deck Panels,
Key Words:
Bridge design; Bridge engineering; Construction; Cost effectiveness; Design standards; Durability; Field tests; Laboratory tests; Precast concrete; Research projects; Structural tests
Budget: 0.00
Project Length: 0
Start Date: 2006
Completion Date: 2009
Best Practices Regarding Performance of ABC Connections in Bridges Subject to Multihazard and Extreme Events NCHRP 20-68A, Scan 11-02
Category: Completed Projects
Group: Synthesis
Subject: Connections
Key Words:
Best practices; Blast loads; Bridge construction; Bridge members; Design load; Earthquakes; Elastic waves; Prefabricated bridges; Storm surges; Structural connection; Tidal waves; Water waves; Wind
Budget: 0.00
Project Length: 0
Start Date: 2016
Completion Date: 2012
Best Practices in Accelerated Construction Techniques; NCHRP 20-68A, Scan 07-02
Category: Completed Projects
Group: Synthesis
Subject: Emergency, Non-Emergency
Key Words:
Best practices; Construction management; Construction projects; Contractors; Cooperation; Design; Partnerships; Project delivery; Road construction
Budget: 0.00
Project Length: 0
Start Date: 2007
Completion Date: 2009
Improving Bridges with Prefabricated Precast Concrete Systems
Category: Completed Projects
Group: Design-Making Tools
Subject: MIDOT/AHP, PBES, Connections, Grouts, DMT, Means/Methods
Key Words:
Bridge construction; Cement grouts; Concrete bridges; Decision support systems; Precast concrete; Prefabricated bridges; State of the practice; Structural connection
Budget: 0.00
Project Length: 14
Start Date: 2010
Completion Date: 2013