Best Practices in Accelerated Construction Techniques; NCHRP 20-68A, Scan 07-02

Category: Completed Projects
Group: Synthesis
Subject: Emergency, Non-Emergency
State: District of Columbia
Abstract:

This scan focused on construction operations and management practices to accelerate the delivery of construction projects. Visiting five states from the East to West Coasts, the scan team sought information from DOT staff and contractors on practices that accelerate project construction. The team visited with transportation leaders in: 1. Jacksonville and Pensacola, Florida; 2. Birmingham and Montgomery, Alabama; 3. Houston, Texas; 4. Salt Lake City, Utah;and 5. Sacramento and Oakland, California. Transportation agency representatives, contractors, suppliers, and engineering consultants having accelerated project experience shared their viewpoints and knowledge at meetings with the scan team. The team then evaluated these practices for their potential application by other transportation agencies. The team found that, for every project examined, the primary factor leading to success was a spirited effort of partnership and collaboration between the DOT and the contractor, together with a supportive design and/or design process.


Key Words:

Best practices; Construction management; Construction projects; Contractors; Cooperation; Design; Partnerships; Project delivery; Road construction


Specific ABC aspect:

Budget and Timeline


Budget (USD): 0.00
Project length: 0
Project Starting Year: 2007
Project Completion Year: 2009

Primary Sponsor


National Cooperative Highway Research Program
Transportation Research Board
500 Fifth Street, NW
Washington, DC 20001 USA



Primary Performing Organization


PI: Stuart Anderson
Co-PI: Cliff Schexnayder



Other Documents


View NCHRP20-68A-Domestic-scan-07-02_Final-Scan-Report_Nov-2009.pdf

Other Related URLs


Go to: https://trid.trb.org/view.aspx?id=1107498