Development of an Accelerated Bridge Construction (ABC) Design and Construction Guide Specification; NCHRP 12-102
Category: Ongoing Projects
Group: Design Specifications
Subject: Design & Construction Spec
Key Words:
Budget: 370000.00
Project Length: 27
Start Date: 2014
Completion Date: 2017
Investigation of Closure Pour Elimination for Phased Construction of Steel Girder Bridges
Category: Completed Projects
Group: Joints
Subject:
Key Words:
Bridge construction; Bridge decks; Girder bridges; Traffic flow
Budget: 75000.00
Project Length: 6
Start Date: 2012
Completion Date: 2013
Development of High Early Strength Connections for Accelerated Bridge Construction
Category: Ongoing Projects
Group: Materials
Subject: High Early
Key Words:
Budget: 175000.00
Project Length: 24
Start Date: 2014
Completion Date: 2016
Application of Self-Consolidating Concrete and Rapid Construction in Bridges
Category: Completed Projects
Group: Materials
Subject: SCC
Key Words:
Bridge construction; Bridge members; Design; Precast concrete; Self compacting concrete
Budget: 255000.00
Project Length: 36
Start Date: 2010
Completion Date: 2015
Guidelines for PBES Tolerances and Dynamic effects for Bridge Moves; NCHRP 12-98
Category: Ongoing Projects
Group: Design Specifications
Subject: Elements & Systems
Key Words:
Budget: 300000.00
Project Length: 27
Start Date: 2014
Completion Date: 2017
Accelerated Bridge Construction in South Dakota: Pilot Study for Implementation Strategy
Category: Ongoing Projects
Group: Design-Making Tools
Subject:
Key Words: Benefit cost analysis; Bridge construction; Demonstration projects; Prefabricated bridges; Traffic volume
Budget: 55000.00
Project Length: 36
Start Date: 2012
Completion Date: 2015
Research on Evaluation and Standardization of Accelerated Bridge Construction (ABC) Techniques
Category: Completed Projects
Group: Standards
Subject:
Key Words: Bridge construction; Bridge foundations; Modular structures; Piles (Supports); Prefabricated bridges; Standardization
Budget: 249000.00
Project Length: 24
Start Date: 2013
Completion Date: 2015
Feasibility Study of Developing and Creating a Standardized Subset of Bridge Plans
Category: Completed Projects
Group: Standards
Subject:
Key Words:
Bridge approaches; Bridge construction; Bridge design; Cost effectiveness; Feasibility analysis; Plans (Drawings)
Budget: 0.00
Project Length: 24
Start Date: 2013
Completion Date: 2016
Durability Assessment of Prefabricated Bridge Elements and Systems
Category: Completed Projects
Group: Standards
Subject: Durability
Key Words:
Bridge construction; Bridge members; Durability; Industrial plants; Prefabricated bridges; Quality control
Budget: 121000.00
Project Length: 12
Start Date: 2013
Completion Date: 2014
A Pilot Case Study to Evaluate the Potential Impact and Benefit of Adopting and Implementing BIM on Bridge and Infrastructure Projects
Category: Completed Projects
Group: Bridge Information Modeling
Subject:
Key Words: Bridge construction; Data collection; Evaluation and assessment; Implementation; Infrastructure; Pilot studies; Quality of work, Infrastructure, BIM, Performance Metrics
Budget: 60000.00
Project Length: 14
Start Date: 2013
Completion Date: 2014