Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects

Category: Completed Projects
Group: Substructure
Subject: Grouted Couplers, Non-seismic
State: Iowa
Abstract:

With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere.

The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes.

The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.


Key Words:

ABC connection details, accelerated bridge construction, chloride penetration testing, fatigue load testing, grouted coupler connections, Keg Creek Bridge, precast concrete bridges, static load testing


Specific ABC aspect:

Budget and Timeline


Budget (USD): 49986.00
Project length: 24
Project Starting Year: 2012
Project Completion Year: 2014

Primary Sponsor


Sponsor #1:
Iowa Department of Transportation
800 Lincoln Way
Ames, IA 50010 USA

Sponsor #1 Contact:
Ahmad Abu-Hawash
ahmad.abu-hawash@dot.iowa.gov
(515) 239-1393

Sponsor #2:
Federal Highway Administration
1200 New Jersey Avenue SE
Washington, DC 20590 USA



Primary Performing Organization


Iowa State University, Ames
Institute for Transportation Studies
2711 S. Loop Drive, Suite 4700
Ames, IA 50010-8864 USA

PI
Brent M. Phares
Director, Bridge Engineering Center
(515) 294-5879
bphares@iastate.edu



Other Documents


View grouted_coupler_connections_for_ABC_w_cvr-final-report.pdf