Found 5 Results

2012 – Broadway Bridge over Little Timber Creek

State: NJ
Year: 2012
Owner: Camden County
Location: Urban
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 66.5
Total Bridge Length (ft.): 66.5
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT (interim stage); Adjacent box beams, Grouted blockout w/shear connectors; Asphalt overlay w/o membrane


2012 – Route 202 Bridge over Passaic River

State: NJ
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 92
Total Bridge Length (ft.): 92
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams), precast abutment cap, precast backwall, precast wingwall, CIP reinforced closure joint, socket connection (in precast substructure), asphalt overlay w/o membrane, precast approach slab, prefabricated railing, other miscellaneous element – precast sleeper slab


2010 – Gordon’s Corner Road Bridge over Route 9

State: NJ
Year: 2010
Owner: State
Location: Urban
Beam material: Steel

Spans: Two-span
Max Span Length (ft.): 59
Total Bridge Length (ft.): 118
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam), CIP reinforced closure joint, precast approach slab


2008 – Route 70 Bridge over Manasquan River (September 11 Memorial Bridge)

State: NJ
Year: 2008
Owner: State
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 120.25
Total Bridge Length (ft.): 724
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: right-of-way acquisition, design-bid-build, lane rental, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: precast caisson cap, precast cap & column(s), MSE wall, PT ducts/bonded, prefabricated railing, steel diaphragm, other miscellaneous element – noise wall panel and post


2005 – Route 1 Bridges over Olden Avenue & Mulberry Street

State: NJ
Year: 2005
Owner: State
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 86.8
Total Bridge Length (ft.): 86.8
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, lane rental, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular Decked Beam), CIP reinforced closure joint, grouted key closure joint