2012 – Route 202 Bridge over Passaic River
State: NJ
Year: 2012
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 92
Total Bridge Length (ft.): 92
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams); Precast abutment caps; Precast backwalls; Precast wingwalls,
CIP reinforced concrete closure joints; Socket connection (in precast substructure); Asphalt overlay w/o membrane; Precast approach slabs; Prefabricated railing; Other miscellaneous element – precast sleeper slabs
2012 – Broadway Bridge over Little Timber Creek
State: NJ
Year: 2012
Owner: Camden County
Location: Urban
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 66.5
Total Bridge Length (ft.): 66.5
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT (interim stage); Adjacent box beams,
Grouted blockout w/shear connectors; Asphalt overlay w/o membrane
2010 – Gordon’s Corner Road Bridge over Route 9
State: NJ
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 59
Total Bridge Length (ft.): 118
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional
Project Planning:
• Design-bid-build
,• Full lane closure• Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions:
• Modular decked beams (MDcBs)
, CIP reinforced concrete closure joints; Precast approach slabs2008 – Route 70 Bridge over Manasquan River (September 11 Memorial Bridge)
State: NJ
Year: 2008
Owner: State
Location: Urban
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 120.25
Total Bridge Length (ft.): 724
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: Right-of-way acquisition,
Design-bid-build,
Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Precast caisson caps; Precast cap & column(s); MSE walls,
PT ducts/bonded; Prefabricated railing; Steel diaphragms; Other miscellaneous element – noise wall panels and posts
2005 – Route 1 Bridges over Olden Avenue & Mulberry Street
State: NJ
Year: 2005
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 86.8
Total Bridge Length (ft.): 86.8
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Lane rental; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular Decked Beam),
CIP reinforced concrete closure joints; Grouted key closure joints