2012 – I-95 Bridge over Hermitage Road

State: VA
Year: 2012
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 66
Total Bridge Length (ft.): 207
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: Other ABC Method

Project Planning: Design-bid-build, Lane rental; Incentive / disincentive clauses; No excuse bonus; Formalized partnering
Geotechnical Solutions:
Structural Solutions: MDcBs (modular concrete-decked steel beams), CIP reinforced concrete closure joints; Grouted key closure joints; Bars in splice couplers; PT ducts/bonded; Match cast closure joint; Epoxy joints; Prefabricated railing


1998 – Dead Run and Turkey Run Bridges (VA)

State: VA
Year: 1998
Owner: National Park Service
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 113
Total Bridge Length (ft.): 402
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: Other project delivery: competitive negotiated procurement, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT, Grouted key closure joint; PT ducts/bonded; Latex-modified overlay


1996 – George P. Coleman Bridge

State: VA
Year: 1996
Owner: State
Location: Urban
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 389
Total Bridge Length (ft.): 3750
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Other ABC Method

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clause; Lump Sum bonus; Formalized partnering
Geotechnical Solutions: Reused Substructure/Foundation Unit, CIP substructure under traffic,
Structural Solutions: Truss span w/deck, CIP reinforced concrete closure joints; LWC deck