Design Guide for Precast UHPC Waffle Deck Panel Systems
Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: Waffle Slabs, Connections
Key Words: accelerated bridge construction, bridge deck connections, bridge design, bridge panel systems, bridge redecking, Highways for LIFE, load testing, precast bridge sections, replacement bridges, ultra-high-performance concrete, waffle decks, Wapello County Iowa
Budget:
Project Length:
Start Date: 2011
Completion Date: 2013
Structural Characterization of a UHPC Waffle Bridge Deck and Connections
Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: Waffle Slabs
Key Words: Civil Construction and Environmental Engineering, BEC, accelerated bridge construction, bridge deck connections, Highways for LIFE, load testing, precast bridge sections, ultra-high-performance concrete, waffle deck, Wapello County Iowa
Budget:
Project Length:
Start Date: 2009
Completion Date: 2011
Development of a Family of Ultra-High Performance Concrete Pi-Girders
Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: PI girders
Key Words: Ultra-high performance concrete, UHPC, finite element analysis, pi-girder, structural optimization
Budget:
Project Length:
Start Date: 2014
Completion Date: 2014
Precast Prestressed Concrete Pavement to Abate Settlement Problems Under Bridge Approach Slabs
Category: Ongoing Projects
Group: Superstructure
Subject: Approach Slabs
Key Words: Bridges and other structures; Design; Highways; Pavements; I30: Materials
Budget: 99955.00
Project Length: 24
Start Date: 2015
Completion Date: 2016
Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation
Category: Completed Projects
Group: Joints
Subject: Bridge Rehabilitation
Key Words: accelerated bridge construction; bridge construction; bridge repair alternatives; rapid bridge rehabilitation; traffic mobility
Budget: 0.00
Project Length: 12
Start Date: 2014
Completion Date: 2015
Development of Prefabricated Bridge Railings
Category: Ongoing Projects
Group: Railings
Subject: Prefabricated Railing
Key Words: Prefabricated Railing
Budget: 0.00
Project Length: 36
Start Date: 2014
Completion Date: 0
Development of Manual for Enhanced Service Life of ABC Projects
Category: Ongoing Projects
Group: Design Specifications
Subject: Enhancement of Service Life, Durability
Key Words: Durability, service life
Budget: 0.00
Project Length: 36
Start Date: 2014
Completion Date: 0
Evaluation of a Bridge Constructed with Ultra High Performance Concrete
Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: PI girders
Key Words:
Bridge tests, concrete bridges, field tests, high-strength concrete, load tests, precast concrete, prestressed concrete, steel fibers, UHPC, ultra-high performance concrete
Budget: 0.00
Project Length: 0
Start Date: 2006
Completion Date: 2010
Design, Construction, and Field Testing of an Ultra-High Performance Concrete Pi-Girder Bridge
Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: PI girders
Key Words:
Bridge tests, concrete bridges, field tests, high-strength concrete, load tests, precast concrete, prestressed concrete, steel fibers, UHPC, ultra-high performance concrete
Budget: 0.00
Project Length: 0
Start Date: 2007
Completion Date: 2010
Laboratory Investigation of the Characterization of Cor-Tuf Flexural and Splitting Tensile Properties
Category: Completed Projects
Group: Ultra-High Performance Concrete (UHPC)
Subject: Alternatives
Key Words:
Cor-Tuf, Ultra-high performance cementitious material, flexural and splitting tensile properties
Budget: 0.00
Project Length: 0
Start Date: 2010
Completion Date: 2010