Development of Prefabricated Bridge Railings

Category: Ongoing Projects
Group: Railings
Subject: Prefabricated Railing
State: Florida
Abstract: Many organizations are promoting and utilizing Accelerated Bridge Construction (ABC) practices to reduce traffic impacts and to reduce societal costs. One of the most common means to achieve ABC is to utilize prefabricated elements which are brought together, on-site, to construct the in-place bridge. The purpose of this research is to begin the process of developing crash-tested prefabricated bridge railings that have durable anchorage details. The need for this work has been previously identified by the AASHTO SCOBS Technical Committee for Construction.
Key Words: Prefabricated Railing
Specific ABC aspect: Prefabricated Railing

Budget and Timeline


Budget (USD): 0.00
Project length: 36
Project Starting Year: 2014
Project Completion Year: 0

Primary Sponsor


Accelerated Bridge Construction University Transportation Center
10555 W. Flagler Street, EC 3680
Miami, FL 33174 USA

Atorod Azizinamini PhD, PE
aazizina@fiu.edu
305-348-0110



Primary Performing Organization


Iowa State University
394 Town Engineering
Aimes, IA 50011 USA

PI: Terry Wipf PhD, PE
515-294-6979
tjwipf@iastate.edu



Other Documents


View 2016-12-19_21-10-31.pdf
View 2016-12-19_21-10-37.pdf

Other Related URLs


Go to: https://abc-utc.fiu.edu/research-projects/development-of-prefabricated-bridge-railings/
{"autoplay":"true","autoplay_speed":"4000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Under Construction