Development of Manual for Enhanced Service Life of ABC Projects

Category: Ongoing Projects
Group: Design Specifications
Subject: Enhancement of Service Life, Durability
State: Florida
Abstract: The nationwide application of ABC in bridge design and construction is at its early stages. Nevertheless, a few ABC projects are decades old, and the number of ABC projects is rapidly increasing. It is essential to observe the performance of ABC projects in service, at the national level, and develop a manual that assists designers and owners in best design, construction and maintenance practices that are capable of enhancing service life of ABC bridges.
Key Words: Durability, service life
Specific ABC aspect: Durability of ABC projects

Budget and Timeline


Budget (USD): 0.00
Project length: 36
Project Starting Year: 2014
Project Completion Year: 0

Primary Sponsor


Accelerated Bridge Construction University Transportation Center
10555 W. Flagler Street, EC 3680
Miami, FL 33174 USA

Atorod Azizinamini PhD, PE
aazizina@fiu.edu
305-348-0110



Primary Performing Organization


Florida International University
10555 W. Flagler Street, EC 3680
Miami, FL 33174 USA

PI: Atorod Azizinamini PhD, PE
aazizina@fiu.edu
305-348-0110



Other Documents


View 2016-08-23_13-18-32.pdf

Other Related URLs


Go to: https://abc-utc.fiu.edu/research-projects/development-of-manual-for-enhanced-service-life-of-abc-projects/
{"autoplay":"true","autoplay_speed":"4000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Under Construction