ABC Research Database

91 research projects found
  • Sandwich Panel Steel Deck System

    • Category: On-Going Projects
    • Group: Decks
    • Subject: Sandwich Panel System
    • Primary Performing Agency: Virginia Polytechnic Institute and State University
    • Primary Sponsor: Virginia Transportation Research Council
    • Start Date: 2010-05-01
    • Completion Date: 2010-08-01
    • Keywords:

      Bridge construction; Bridge decks; Bridge superstructures; Girder bridges;Lightweight materials; Steel bridges

    • Specific ABC aspect:
  • Optimized Shear Stud Spacing for Precast Deck Panel Construction

    • Category: On-Going Projects
    • Group: Decks
    • Subject: Shear Studs for Panels
    • Primary Performing Agency: Federal Highway Administration (FHWA)
    • Primary Sponsor: Federal Highway Administration (FHWA)
    • Start Date: 2011-06-01
    • Completion Date: 2015-01-01
    • Keywords:

      composite,construction,Infrastructure,Research studs,Fatigue,Steel bridges, Bridge construction,Superstructures

    • Specific ABC aspect:
  • Evaluation of Accelerated Bridge Construction (ABC) – A Forensic Analysis (on deck panels)

    • Category: On-Going Projects
    • Group: Decks
    • Subject: Shear Studs for Panels
    • Primary Performing Agency: Utah State University
    • Primary Sponsor: University Transportation Centers
    • Start Date: 2013-04-01
    • Completion Date: 0000-00-00
    • Keywords:
    • Specific ABC aspect:
  • image

    Simplified Full-Depth Precast Concrete Deck Panel Systems; NCHRP Project 12-96

    • Category: Completed Projects
    • Group: Decks
    • Subject: Deck Panels
    • Primary Performing Agency: The George Washington University
    • Primary Sponsor: National Cooperative Highway Research Program (NCHRP)
    • Start Date: 2013-07-01
    • Completion Date: 2016-06-30
    • Keywords:
    • Specific ABC aspect:
  • image

    Transverse Joint Configuration Development and Testing for a Modular Bridge Deck Replacement

    • Category: Completed Projects
    • Group: Decks
    • Subject: Deck Panels
    • Primary Performing Agency: University of New Hampshire
    • Primary Sponsor: New Hampshire Department of Transportation
    • Start Date: 2008-12-01
    • Completion Date: 2011-03-01
    • Keywords:

      Modular structures, Bridge decks, Bridge construction, Transverse joints, Structural health monitoring, Shear strength,

    • Specific ABC aspect:
  • image

    Innovative Modular High Performance Lightweight Decks for Accelerated Bridge Construction

    • Category: Completed Projects
    • Group: Decks
    • Subject: Deck Panels
    • Primary Performing Agency: Florida International University
    • Primary Sponsor: Florida Department of Transportation
    • Start Date: 2013-11-01
    • Completion Date: 2015-05-01
    • Keywords:

      Bridge decks, Load factor, Bridge construction, Defects, Aging infrastructure, Service life, High performance concrete, Fiber reinforced polymers, Lightweight materials

    • Specific ABC aspect:
  • Long-Term Performance Evaluation of NUDECK

    • Category: On-Going Projects
    • Group: Decks
    • Subject: Deck Panels
    • Primary Performing Agency: University of Nebraska, Lincoln
    • Primary Sponsor: Nebraska Department of Roads
    • Start Date: 2013-07-01
    • Completion Date: 2016-06-01
    • Keywords:

      Bridge decks, Precast concrete, Prestressed concrete bridges, Girders, Posttensioning, Inspection, Service life,Nebraska

    • Specific ABC aspect:
  • image

    Investigation of Techniques for Accelerating the Construction of Bridge Deck Overlays

    • Category: Completed Projects
    • Group: Decks
    • Subject: Deck Overlays
    • Primary Performing Agency: Iowa State University, AmesInstitute for Transportation Studies
    • Primary Sponsor: Iowa Department of Transportation
    • Start Date: 2014-05-01
    • Completion Date: 2016-04-30
    • Keywords: bridge deck overlays, bridge deck rehabilitation, bridge service life, overlay construction time, overlay curing time
    • Specific ABC aspect:
  • image

    Evaluation and Analysis of Decked Bulb T Beam Bridge

    • Category: Completed Projects
    • Group: Super Structure
    • Subject: Decked Bulb Ts
    • Primary Performing Agency: Center for Innovative Material Research (CIMR)
    • Primary Sponsor: Michigan Department of Transportation (MDOT)
    • Start Date: 2011-09-19
    • Completion Date: 2015-02-28
    • Keywords:

      Decked bulb T beam, bridges, transverse post- tensioning, longitudinal cracks, transverse diaphragms, ultra high performance concrete. CFRP prestressing strands, Un-bonded strands

    • Specific ABC aspect:
  • In-Service Performance Evaluation and Monitoring of the Hybrid Composite Beam Bridge System

    • Category: Completed Projects
    • Group: Super Structure
    • Subject: Composites
    • Primary Performing Agency: University of Virginia, Charlottesville
    • Primary Sponsor: Virginia Center for Transportation Innovation and Research
    • Start Date: 2012-12-15
    • Completion Date: 2013-12-31
    • Keywords:

      Bridge construction; Bridges; Composite structures; Fabrication; Inspection; Live loads; Performance evaluations

    • Specific ABC aspect: