*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 2 Results

2011 – Buffalo Creek Bridge

State: SD
Year: 2011
Owner: Perkins County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 60
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee); Steel sheet piling; Other abutment element: precast planks, Grouted key closure joints


2010 – 41st Street Bridge

State: SD
Year: 2010
Owner: City of Sioux Falls
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 125
Total Bridge Length (ft.): 305
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, A+B bidding; Incentive / disincentive clauses; Lump sum
Geotechnical Solutions:
Structural Solutions: Adjacent box beams, Grouted key closure joints; PT ducts/bonded