*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Reset Search
Found 11 Results
1973 – Fremont Bridge
State: OR
Year: 1973
Owner: State
Location: Urban
Beam material: Steel
Spans: Three-span
Max Span Length (ft.): 1255
Total Bridge Length (ft.): 2152
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: State Process,
Design-bid-build,
Full lane closure
Geotechnical Solutions:
Structural Solutions: Orthotropic deck,
Arch span w/deck