Found 2 Results

2023 – CO 61 North of Otis, D-25-EA

State: CO
Year: 2023
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 112
Total Bridge Length (ft.): 118
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide

Project Planning: State process, benefit/cost method, CM/GC, formalized partnering
Geotechnical Solutions:
Structural Solutions: adjacent box beam, precast abutment cap, precast wingwall, FDcBc {Full-Width concrete-Decked concrete Beam Unit}, precast approach slab, other miscellaneous prefabricated element: precast sleeper slab, CIP reinforced closure joint, socket connection, asphalt overlay w/membrane


2002 – SH 86 Bridge over Mitchell Gulch

State: CO
Year: 2002
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 40
Total Bridge Length (ft.): 40
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure, Lane rental, Value Engineering
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams, Precast abutment caps, Precast abutment stems, Precast wingwalls, PT ducts/bonded, Asphalt overlay w/membrane, Prefabricated railing