Accelerated Bridge Construction Deck Panel Testing

Category: Completed Projects
Group: Decks
Subject: Transverse Joints for Panels
State: Utah
Abstract: Accelerated Bridge Construction techniques have resulted in state-of-the-art options that save time and money during the construction of new or existing bridges. One such group of techniques that has generated considerable interestis the use of precast concrete deck panels. Utilizing precast concrete deck panels allows for offsite curing, thus eliminating long delays due to formwork construction and concrete curing time. despite the benefits, problems can develop due to the inherent joints between the individual panels. These joints are locations for potential leakage, which can result in corrosion or inadequate long-term performance. Post-tensioning the precast deck panels helps to eliminate leakage;however, conventional longitudinal post-tensioning systems require complete deck replacement in the event of a single faulty deck panel. The proposed post-tensioned, curved-strand connection,presented in this research allows for a single panel replacement. The capacity of the proposed curved-strand connection was investigated in order to compare its behavior to other systems that are currently in use. The curved-strand connection was found to be comparable to a standard post-tensioning system. The ultimate capacity of the curved-strand connection in negative bending was found to be 97% of the standard post-tensioning.
Key Words: Accelerated Bridge Construction, Precast,Deck, Panels, Losses
Specific ABC aspect:

Budget and Timeline


Budget (USD): 38723.00
Project length: 12
Project Starting Year: 2012
Project Completion Year: 2013

Primary Sponsor


Sponsor #1:
Center for Advanced Infrastructure & Transportation
Rutgers University
100 Brett Rd
Piscataway 31 08854-8058 USA

Sponsor #1 Contact:
Pat Szary
(732) 445-0579

Sponsor #2:
Utah Department of Transportation
4501 South 2700 West Project Development
Salt Lake City 45 84114-8380 USA

Sponsor #2 Contact:
Abdul Wakil
awakil@utah.gov
(801) 964-4455



Primary Performing Organization


Utah State University Transportation Center
4110 Old Main Hill
Logan, UT 84322-4110 USA

PI: Marvin Halling
(435) 797-3179
halling@cc.usu.edu



Other Documents


View FinalReport_CAIT-UTC-003_ABC-Deck-Panel-Testing_USU.pdf

Other Related URLs


Go to: https://cait.rutgers.edu/research/accelerated-bridge-construction-deck-panel-testing/
Go to: https://drive.google.com/file/d/0BzkVJvrt-xuIS3hCa3ZnZ0lzX2c/edit
{"autoplay":"true","autoplay_speed":"4000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Under Construction