Category: Completed Projects
Group: Decks
Subject: Transverse Joints for Panels
State: Utah Abstract: This project is examining new connections between pre-cast bridge deck plates. In accelerated bridge construction off site pre-cast deck panels are often used. Once placed on the bridge girders, these deck panels must be tied together. This research is examining improved connections to ensure proper performance of these panel connections.
Key Words: Bridge construction; Bridge decks; Bridge design; Design; Laboratory tests;Prefabricated structures; Structural connection
Specific ABC aspect:
Budget (USD): 117545.00
Project length: 36
Project Starting Year: 2008
Project Completion Year: 2010
Go to: https://rip.trb.org/View/1229314
Group: Decks
Subject: Transverse Joints for Panels
State: Utah Abstract: This project is examining new connections between pre-cast bridge deck plates. In accelerated bridge construction off site pre-cast deck panels are often used. Once placed on the bridge girders, these deck panels must be tied together. This research is examining improved connections to ensure proper performance of these panel connections.
Key Words: Bridge construction; Bridge decks; Bridge design; Design; Laboratory tests;Prefabricated structures; Structural connection
Specific ABC aspect:
Budget and Timeline
Budget (USD): 117545.00
Project length: 36
Project Starting Year: 2008
Project Completion Year: 2010
Primary Sponsor
Utah Department of Transportation
4501 South 2700 West Project Development
Salt Lake City, UT 84114-8380 USA
Daniel Hsiao
dhsiao@utah.gov
(801) 633-1580
Primary Performing Organization
Utah State University Transportation Center
4110 Old Main Hill
Logan, UT 84322-4110 USA
PI: Marvin Halling
(435) 797-3179
halling@cc.usu.edu
Other Documents
Other Related URLs
Go to: https://rip.trb.org/View/1229314