Found 133 Results

1992 – Pelican Creek Bridge

State: AK
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 59.3
Total Bridge Length (ft.): 178
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: adjacent T beam (double tee), precast pile cap, precast abutment cap, PT ducts/bonded, socket connection (in precast substructure)-(caps)


1983 – Linn Cove Viaduct

State: NC
Year: 1983
Owner: National Park Service
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 180
Total Bridge Length (ft.): 1243
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: FHWA Process, Design-Bid-Build,
Geotechnical Solutions: Micropiles,
Structural Solutions: Precast segmental beam elements; Precast column(s), PT ducts/bonded


1973 – Fremont Bridge

State: OR
Year: 1973
Owner: State
Location: Urban
Beam material: Steel

Spans: Three-span
Max Span Length (ft.): 1255
Total Bridge Length (ft.): 2152
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: State Process, Design-bid-build, Full lane closure
Geotechnical Solutions:
Structural Solutions: Orthotropic deck, Arch span w/deck