*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Reset Search
Found 1 Results
2009 – Inyan Kara Creek Bridge
State: WY
Year: 2009
Owner: Crook County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 85
Total Bridge Length (ft.): 85
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure
Geotechnical Solutions:
Structural Solutions: adjacent deck bulb T beam, precast abutment cap, precast backwall, precast wingwall,
grouted key closure joint