• Reset
Found 1 Results

2009 – CTH B Bridge over Parsons Creek

State: WI
Year: 2009
Owner: Fond du Lac County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 21.67
Total Bridge Length (ft.): 21.67
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: In-house force: county crews, Full lane closure
Geotechnical Solutions:
Structural Solutions: Precast 3-sided culvert; Precast wingwalls, Grouted key closure joints