2011 – Chester VT 103 Bridge 8

State: VT
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 56
Total Bridge Length (ft.): 56
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Other ABC Method

Project Planning: State process, design-bid-build, full lane closure, incentive / disincentive clauses, lump sum bonus
Geotechnical Solutions:
Structural Solutions: MDcBc {Modular concrete-Decked concrete Beam} (28D NEXT Beam), precast abutment caps, precast abutment stems, precast footing(s), CIP reinforced closure joint (deck), match cast closure joints (abutments), grouted key closure joints (abutments), bars in splice couplers (abutments), socket connections (abutments), epoxy joints (abutments), asphalt overlay w/membrane, precast approach slabs, precast curbs


2011 – Chester VT 103 Bridge 9

State: VT
Year: 2011
Owner: State
Location: Urban
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 119.81
Total Bridge Length (ft.): 119.81
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Other ABC Method

Project Planning: State process, design-bid-build, full lane closure, incentive / disincentive clauses, lump sum bonus
Geotechnical Solutions:
Structural Solutions: precast abutment caps, precast wingwalls, match cast closure joints (abutments), PT ducts/un-bonded (abutments), socket connections (abutments), epoxy joints (abutments), asphalt overlay w/membrane, precast approach slabs


2007 – Route 4 Bridge 50 over Ottauquechee River (Woodstock)

State: VT
Year: 2007
Owner: Town of Woodstock
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 84
Total Bridge Length (ft.): 202.5
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Other decision-making tool: Stakeholder Meetings held to present alternatives, Right-of-Way acquisition, Design-bid-build, Full lane closure; Incentive / disincentive clause; Lump sum bonus; Value Engineering
Geotechnical Solutions: CIP substructure under traffic,
Structural Solutions: Adjacent box beams, Modular block walls, CIP reinforced concrete closure joint; Grouted key closure joint; Asphalt overlay w/membrane; LWC beams