2022 – Glenbridge Avenue Bridge
State: RI
Year: 2022
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 76.75
Total Bridge Length (ft.): 153.5
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide
Project Planning: electronic shop drawing submittal & approval process,
design-bid-build,
full lane closure, other contracting - The ABC aspects of the project were owner initiated and treated as a construction change.
Geotechnical Solutions: CIP substructure under traffic, reused substructure/foundation unit,
Structural Solutions: other pier element - precast bearing pedestals on CIP wall pier, precast wingwall,
FDcBs,
precast approach slab