2019 – Shaler Street Bridge
State: PA
Year: 2019
Owner: State
Location: Urban
Beam material: Steel
Spans: Two-span
Max Span Length (ft.): 70
Total Bridge Length (ft.): 140
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: SPMTs
Project Planning: FHWA process, state process,
right-of-way acquisition,
design-bid-build,
full lane closure
Geotechnical Solutions: high-capacity pile, CIP substructure under traffic, other foundation/wall - soil nail wall,
Structural Solutions: precast cheek wall, precast lagging panel, other abutment and wall element - soldier pile and lagging wingwall,
FDcBs,
steel diaphragm, CIP reinforced closure joint, other closure joint/connection - simple for dead load, continuous for live load connection at pier

2017 – Bridge NB-355 at Milepost A-57.66
State: PA
Year: 2017
Owner: Pennsylvania Turnpike Commission
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 118
Total Bridge Length (ft.): 118
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide
Project Planning: design-bid-build, lane rental
Geotechnical Solutions: micropiles,
Structural Solutions: FDcBs {Full-Width concrete-Decked steel Beam Unit},

2016 – Wrights Corners Bridge
State: PA
Year: 2016
Owner: State
Location: Rural
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 45
Total Bridge Length (ft.): 49
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional
Project Planning: Public-Private Partnership (P3),
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam) - Folded Steel Plate Girder System (FSPGS),
CIP reinforced concrete closure joints, prefabricated railing, polyester polymer concrete overlay

2016 – Strodes Mills Bridge
State: PA
Year: 2016
Owner: State
Location: Rural
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 50
Total Bridge Length (ft.): 54
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional
Project Planning: Public-Private Partnership (P3),
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam) - Folded Steel Plate Girder System (FSPGS),
CIP reinforced concrete closure joints, prefabricated railing, polyester polymer concrete overlay

2012 – Montour Run Bridge No. 6
State: PA
Year: 2012
Owner: Allegheny County
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 47.8
Total Bridge Length (ft.): 47.8
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Other ABC Method
Project Planning: design-bid-build,
full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: steel grid (concrete filled) deck, precast abutment cap w/backwall,
FDcBs (full-width concrete-decked steel beam),
precast curb, LWC deck, other miscellaneous prefabricated element – precast moment slab