*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Reset Search
Found 1 Results


2019 – U.S. 183/412 Bridge over Wolf Creek Rehabilitation
State: OK
Year: 2019
Owner: State
Location: Rural
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 85
Total Bridge Length (ft.): 425
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
Geotechnical Solutions:
Structural Solutions: UHPC closure joint, other closure joint/connection - UHPC live-load continuity connection repair between spans

