2010 – I-93 Bridge over Loudon Road (Route 9)
State: NH
Year: 2010
Owner: State
Location: Urban
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 82
Total Bridge Length (ft.): 82
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Conventional
Project Planning: State process,
design-bid-build,
incentive / disincentive clause, no excuse bonus, value engineering
Geotechnical Solutions:
Structural Solutions: full-depth precast deck panel w/PT,
CIP reinforced closure joint, grouted key closure joint, PT ducts/bonded, asphalt overlay w/membrane

2004 – Mill Street Bridge
State: NH
Year: 2004
Owner: Town of Epping, NH
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 115
Total Bridge Length (ft.): 115
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: adjacent box beam, precast backwall, precast wingwall, precast abutment footing,
grouted key closure joint, bars in splice coupler, PT ducts/bonded, asphalt overlay w/membrane