*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 1 Results

2020 – Clark Fork River Bridge

State: MT
Year: 2020
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 200
Total Bridge Length (ft.): 920
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Other ABC Method

Project Planning: State process, benefit/cost method, CM/GC, full lane closure, incentive / disincentive clause
Geotechnical Solutions: reused substructure/foundation unit,
Structural Solutions: full-depth precast deck panel w/o PT, other superstructure / substructure system - seismic retrofits improving seat length and bearings at abutments, CIP reinforced closure joint, standard concrete overlay