*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 3 Results

2011 – I-44 Bridge over Gasconade River

State: MO
Year: 2011
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 150
Total Bridge Length (ft.): 670
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Lateral Slide

Project Planning: design-bid-build, A+B bidding (A B bidding), full lane closure, incentive / disincentive clause, contractor revision
Geotechnical Solutions:
Structural Solutions: FDcBs (full-width concrete-decked steel beam unit),


2004 – Nemo Bridge (Route 64 over Lindley Creek)

State: MO
Year: 2004
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 90
Total Bridge Length (ft.): 1684
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: State process, right–of-way acquisition (for dock easement only), design-bid-build, full lane closure, Incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: full-depth precast deck panel w/PT, CIP reinforced closure joint, grouted blockout w/shear connector, PT ducts/bonded, match cast closure joint, micro-silica concrete overlay


2003 – I-70 / Lake St. Louis Boulevard Bridge

State: MO
Year: 2003
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 67
Total Bridge Length (ft.): 134
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, value engineering
Geotechnical Solutions:
Structural Solutions: adjacent box beam, MSE wall, grouted key closure joint