2016 – Franklin Avenue Bridge Rehabilitation

State: MN
Year: 2016
Owner: Hennepin County
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 400
Total Bridge Length (ft.): 1050
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: Benefit/Cost Method, Programmatic Agreements, Early Environmental Clearance & Permitting, Design-Bid-Build, Incentive / Disincentive Clause
Geotechnical Solutions:
Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Column Cap (Precast Spandrel Cap Beams), Precast Abutment Cap, UHPC Closure Joint, Polymer Concrete Overlay, Precast Approach Slab, Prefabricated Railing (Ornamental Rail Panels)


2014 – Larpenteur Avenue Bridge

State: MN
Year: 2014
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 91.2
Total Bridge Length (ft.): 187.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Lateral Slide

Project Planning: Design-Build, Best Value Award
Geotechnical Solutions:
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit}, Thin-Bonded Epoxy Overlay


2013 – TH 36 over Keller Lake Bridge

State: MN
Year: 2013
Owner: State
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 46.5
Total Bridge Length (ft.): 118.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: precast pile caps; precast abutment stems; precast wingwalls; adjacent inverted T beams, socket connection (in precast substructure)


2012 – Maryland Avenue Bridge

State: MN
Year: 2012
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 102.75
Total Bridge Length (ft.): 210.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: SPMTs

Project Planning: design-build, best value award
Geotechnical Solutions: EPS geofoam
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit}, thin-bonded epoxy overlay


2012 – Rock County Road 55 Bridge over Railroad

State: MN
Year: 2012
Owner: Rock County
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 82.5
Total Bridge Length (ft.): 82.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build,
Geotechnical Solutions: GRS IBS [Geosynthetic Reinforced Soil Integrated Bridge System],
Structural Solutions: adjacent box beams, GRS abutments, asphalt overlay w/o membrane


2012 – TH 53 Bridge over Paleface River

State: MN
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 75
Total Bridge Length (ft.): 75
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT, CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Thin-bonded epoxy overlay


2011 – TH 61 Bridge over Gilbert Creek

State: MN
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 41
Total Bridge Length (ft.): 123
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, A+B bidding; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent inverted T beams; Precast pile caps; Precast abutment stems; Precast wingwalls, CIP reinforced concrete closure joints; Socket connection (in precast substructure); Thin-bonded epoxy overlay