2016 – Franklin Avenue Bridge Rehabilitation
State: MN
Year: 2016
Owner: Hennepin County
Location: Urban
Beam material: Concrete
Spans: > Three-span
Max Span Length (ft.): 400
Total Bridge Length (ft.): 1050
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method
Project Planning: Benefit/Cost Method,
Programmatic Agreements, Early Environmental Clearance & Permitting,
Design-Bid-Build,
Incentive / Disincentive Clause
Geotechnical Solutions:
Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Column Cap (Precast Spandrel Cap Beams), Precast Abutment Cap,
UHPC Closure Joint, Polymer Concrete Overlay, Precast Approach Slab, Prefabricated Railing (Ornamental Rail Panels)
2014 – Larpenteur Avenue Bridge
State: MN
Year: 2014
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 91.2
Total Bridge Length (ft.): 187.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Lateral Slide
Project Planning: Design-Build,
Best Value Award
Geotechnical Solutions:
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit},
Thin-Bonded Epoxy Overlay
2013 – TH 36 over Keller Lake Bridge
State: MN
Year: 2013
Owner: State
Location: Urban
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 46.5
Total Bridge Length (ft.): 118.1
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: precast pile caps; precast abutment stems; precast wingwalls; adjacent inverted T beams,
socket connection (in precast substructure)
2012 – TH 53 Bridge over Paleface River
State: MN
Year: 2012
Owner: State
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 75
Total Bridge Length (ft.): 75
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/PT,
CIP reinforced concrete closure joints; Grouted key closure joints; PT ducts/bonded; Thin-bonded epoxy overlay
2012 – Maryland Avenue Bridge
State: MN
Year: 2012
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 102.75
Total Bridge Length (ft.): 210.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: SPMTs
Project Planning: design-build,
best value award
Geotechnical Solutions: EPS geofoam
Structural Solutions: FDcBc {Full-Width concrete-Decked concrete Beam Unit},
thin-bonded epoxy overlay
2012 – Rock County Road 55 Bridge over Railroad
State: MN
Year: 2012
Owner: Rock County
Location: Rural
Beam material: Concrete
Spans: One-span
Max Span Length (ft.): 82.5
Total Bridge Length (ft.): 82.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: design-bid-build,
Geotechnical Solutions: GRS IBS [Geosynthetic Reinforced Soil Integrated Bridge System],
Structural Solutions: adjacent box beams, GRS abutments,
asphalt overlay w/o membrane
2011 – TH 61 Bridge over Gilbert Creek
State: MN
Year: 2011
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 41
Total Bridge Length (ft.): 123
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
A+B bidding; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent inverted T beams; Precast pile caps; Precast abutment stems; Precast wingwalls,
CIP reinforced concrete closure joints; Socket connection (in precast substructure); Thin-bonded epoxy overlay