2009 – MD 362 Bridge over Monie Creek

State: MD
Year: 2009
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 55
Total Bridge Length (ft.): 55
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: adjacent slab beam, precast abutment cap, precast wingwall, steel sheet piling, precast curb, CIP reinforced closure joint, grouted key closure joint, bars in splice coupler, PT ducts/bonded, socket connection (in precast substructure)-(caps), latex-modified overlay


2008 – MD 450 Bridge over Bacon Ridge Branch

State: MD
Year: 2008
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 58
Total Bridge Length (ft.): 58
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: adjacent slab beam, precast curb, grouted key closure joint, PT ducts/bonded, standard concrete overlay


2008 – MD 28 Bridge over Washington Run

State: MD
Year: 2008
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 40
Total Bridge Length (ft.): 40
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: adjacent slab beam, precast curb, grouted key closure joint, PT ducts/bonded, standard concrete overlay


2001 – MD Route 24 Bridge over Deer Creek (Rocks Steel Truss Bridge)

State: MD
Year: 2001
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 122.5
Total Bridge Length (ft.): 122.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: design-bid-build, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: FRP deck panel, CIP reinforced closure joint, grouted blockout w/shear connector, asphalt overlay w/o membrane