2009 – MD 362 Bridge over Monie Creek

State: MD
Year: 2009
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 55
Total Bridge Length (ft.): 55
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams; Precast abutment cap; Precast wingwalls; Steel sheet piling, CIP reinforced concrete closure joints; Grouted key closure joints; Bars in splice couplers; PT ducts/bonded; Socket connection (in precast substructure)-(caps); Precast curbs; Latex-modified overlay


2008 – MD 28 Bridge over Washington Run

State: MD
Year: 2008
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 40
Total Bridge Length (ft.): 40
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams, Grouted key closure joints; PT ducts/bonded; Standard concrete overlay


2008 – MD 450 Bridge over Bacon Ridge Branch

State: MD
Year: 2008
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 58
Total Bridge Length (ft.): 58
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Adjacent slab beams, Grouted key closure joints; PT ducts/bonded; Standard concrete overlay


2001 – MD Route 24 Bridge over Deer Creek (Rocks Steel Truss Bridge)

State: MD
Year: 2001
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 122.5
Total Bridge Length (ft.): 122.5
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: FRP deck panels, CIP reinforced concrete closure joints; Grouted blockout w/shear connectors; Asphalt overlay w/o membrane