*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 2 Results

2010 – Vista Interchange Bridge

State: ID
Year: 2010
Owner: State
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 91.5
Total Bridge Length (ft.): 182
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Lane rental; Value Engineering
Geotechnical Solutions:
Structural Solutions: Precast column cap (precast bent cap; precast crossbeam); Precast abutment cap; MSE wall, Bars in splice couplers; Grouted duct connection (in precast substructure)


2009 – Black Cat Road Bridge

State: ID
Year: 2009
Owner: State
Location: Rural
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 97
Total Bridge Length (ft.): 196
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-bid-build, Full lane closure; Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Precast cap & column(s); MSE walls, Bars in splice couplers; Grouted duct connection (in precast substructure)