*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 2 Results

Completed bridge

2019 – Blackhall Road at Rum Creek Bridge

State: GA
Year: 2019
Owner: County
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 93
Total Bridge Length (ft.): 195
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: FHWA process, state process, benefit/cost method, right-of-way acquisition, design-bid-build, A+B bidding, full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBc (Modular concrete-Decked concrete Beam), steel diaphragm, UHPC closure joint


2008 – I-85 / Kia Boulevard Bridge

State: GA
Year: 2008
Owner: State
Location: Rural
Beam material: Steel

Spans: > Three-span
Max Span Length (ft.): 132
Total Bridge Length (ft.): 384
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Conventional

Project Planning: Design-build, Incentive / disincentive clauses
Geotechnical Solutions:
Structural Solutions: Precast cap & column(s), Bars in splice couplers; Grouted duct connection (in precast substructure)