*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 3 Results

2007 – I-10 Bridge over Escambia Bay (Replacement Spans)

State: FL
Year: 2007
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 250
Total Bridge Length (ft.): 13728
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: early environmental clearance & permitting, design-build, A+B bidding, warranty, lane rental, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: precast pile cap, precast footing(s), pocket connection (in precast substructure)


2006 – Graves Avenue over I-4

State: FL
Year: 2006
Owner: County
Location: Urban
Beam material: Concrete

Spans: Two-span
Max Span Length (ft.): 143
Total Bridge Length (ft.): 286
Impact Category: Tier 1 (within 1 day)
Construction Equipment Category: SPMTs

Project Planning: design-bid-build, A+B bidding, full lane closure, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: FDcBc (Full-width concrete Decked concrete Beam unit), CIP reinforced closure joint


2004 – I-10 Bridge over Escambia Bay (original emergency repair)

State: FL
Year: 2004
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 60
Total Bridge Length (ft.): 3400
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Other ABC Method

Project Planning: design-build, emergency contract, incentive / disincentive clause
Geotechnical Solutions:
Structural Solutions: steel pile caps, RDcBc (Reused concrete-decked concrete beam span), metal panel deck spans,