2006 – O’Malley Road Bridge
State: AK
Year: 2006
Owner: State
Location: Urban
Beam material: Concrete
Spans: Two-span
Max Span Length (ft.): 110
Total Bridge Length (ft.): 223
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent deck bulb T beams,
Grouted key closure joints, Grouted blockout w/shear connectors, Asphalt overlay w/membrane
2006 – Grayling Creek Bridge
State: AK
Year: 2006
Owner: State
Location: Rural
Beam material: Steel
Spans: One-span
Max Span Length (ft.): 148
Total Bridge Length (ft.): 148
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT,
Grouted key closure joint, Grouted blockout w/shear connectors
2000 – Kouwegok Slough Bridge
State: AK
Year: 2000
Owner: State
Location: Rural
Beam material: Steel
Spans: Three-span
Max Span Length (ft.): 144
Total Bridge Length (ft.): 378
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Full-depth precast deck panel w/o PT, Precast pile caps, Precast abutment caps, Precast lagging panels,
Grouted key closure joint, Grouted blockout w/shear connectors
1992 – Pelican Creek Bridge
State: AK
Year: 1992
Owner: State
Location: Rural
Beam material: Concrete
Spans: Three-span
Max Span Length (ft.): 59.3
Total Bridge Length (ft.): 178
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional
Project Planning: Design-bid-build,
Geotechnical Solutions:
Structural Solutions: Adjacent T beams (double tee), Precast pile caps, Precast abutment caps,
PT ducts/bonded, Socket connection (in precast substructure)-(caps)