ABC Project Database

3 bridges found
  • image
    2012 - I-95 Bridge over Hermitage Road
      State: Virginia ;    Year: 2012 ;    Location: Interstate 95 over Hermitage Road in the city of Richmond ;    Spans: > Three-span ;    Dimensions: Two adjacent four-span modular-beam-with-deck bridges, each 207-ft long and 54.33-ft wide (34 ft - 66 ft – 66 ft - 41 ft); 46º skew ;    Beam Material: Steel ;    Structural Solutions: MDcBs (modular concrete-decked steel beams); CIP reinforced concrete closure joints; Grouted key closure joints; Bars in splice couplers; PT ducts/bonded; Match cast closure joint; Epoxy joints; Prefabricated railing ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Lane rental; Incentive / disincentive clauses; No excuse bonus; Formalized partnering ;    Construction Equipment: High-capacity crane(s); Multi-axle flatbed trailers
  • image
    1998 - Dead Run and Turkey Run Bridges (VA)
      State: Virginia ;    Year: 1998 ;    Location: George Washington Memorial Parkway ;    Spans: Three-span ;    Dimensions: Dead Run: Two 305-ft long and 36-ft wide, two-lane, three-span adjacent bridges (96 ft - 113 ft - 96 ft); 0º skew and 2,290-ft radius horizontal curve [only southbound bridge deck replaced]; Turkey Run: Two 402-ft-long and 36-ft wide, two-lane, four- ;    Beam Material: Concrete ;    Structural Solutions: Full-depth precast deck panel w/PT; Grouted key closure joint; PT ducts/bonded; Latex-modified overlay ;    Geotechnical Solutions: ;    Project Planning: ; Other project delivery: competitive negotiated procurement; Full lane closure; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    1996 - George P. Coleman Bridge
      State: Virginia ;    Year: 1996 ;    Location: Route 17 (George Washington Memorial Highway) across the York River between Yorktown and Gloucester Point southeast of Richmond ;    Spans: > Three-span ;    Dimensions: 3,750-ft-long and 77.33-ft-wide 21-span double-swing steel deck truss bridge (2 @ 65 ft – 4 @ 90 ft – 280 ft – 350 ft – 389 ft – 500 ft – 389 ft – 350 ft – 280 ft – 8 @ 90 ft) ;    Beam Material: Steel ;    Structural Solutions: ; Truss span w/deck; CIP reinforced concrete closure joints; LWC deck ;    Geotechnical Solutions: CIP substructure under traffic ;    Project Planning: ; Design-bid-build; Full lane closure; Incentive / disincentive clause; Lump Sum bonus; Formalized partnering ;    Construction Equipment: Float in; High-capacity crane(s)