ABC Project Database

5 bridges found
  • image
    2011 - Cedar Street Bridge (Wellesley)
      State: Massachusetts ;    Year: 2011 ;    Location: Cedar Street (urban minor arterial) over Route 9 in the town of Wellesley in Norfolk County, just west of the I-95/9 Interchange and west of Boston ;    Spans: Two-span ;    Dimensions: 83.08-ft-long and 53.33-ft-wide two-span continuous steel girder bridge roll-in (41.54 ft – 41.54 ft); 7º skew; 530-ton self-weight ;    Beam Material: Steel ;    Structural Solutions: Precast column cap (precast bent cap; precast crossbeam), Precast abutment cap; FDcBs (Full-width concrete-decked steel beam; CIP reinforced concrete closure joint, Bars in splice coupler, Asphalt overlay w/membrane, Precast approach slab ;    Geotechnical Solutions: ;    Project Planning: State process, Benefit/Cost Method; Right-of-way acquisition, Electronic shop drawing submittal & approval process; Design-Build; Full lane closure, Incentive / disincentive clauses, No Excuse bonus, Lump Sum bonus ;    Construction Equipment: SPMT(s); High-capacity crane(s)
  • image
    2011 - Uxbridge –River Road Bridge over Ironstone Brook
      State: Massachusetts ;    Year: 2011 ;    Location: River Road over Ironstone Brook in the town of Uxbridge in Worcester County ;    Spans: One-span ;    Dimensions: 47-ft-long and 35.25-ft-wide single-span modular decked steel folded plate girder bridge ;    Beam Material: Steel ;    Structural Solutions: MDcBs/FSPGS (Modular decked beams); Precast abutment stems; Precast retaining walls; CIP reinforced concrete closure joints; PT ducts/bonded; Match cast closure joint; Socket connection (in precast substructure); Epoxy joints; Micro-silica concrete overlay; Precast curbs ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure; Value Engineering ;    Construction Equipment: Conventional
  • image
    2011 - Salem Street Bridge Eastbound (93Fast14)
      State: Massachusetts ;    Year: 2011 ;    Location: Interstate 93 Southbound over Salem Street / Route 60 Eastbound in the city of Medford in Middlesex County, approximately five miles north of Boston ;    Spans: Three-span ;    Dimensions: 160-ft-long and 68.79-ft wide adjacent three-span modular-beam-and-deck bridges (38 ft – 78 ft – 38 ft) ;    Beam Material: Steel ;    Structural Solutions: MDcBs (modular concrete-decked steel beams); CIP reinforced concrete closure joints; HESt-LSh concrete joints; Link slab; Asphalt overlay w/membrane ;    Geotechnical Solutions: Reused Substructure/Foundation Unit ;    Project Planning: State process; Early environmental clearance & permitting; Electronic shop drawing submittal & approval process; Design-Build; Full lane closure; Warranty; Incentive / disincentive clauses; No Excuse bonus; Value Engineering ;    Construction Equipment: High-capacity crane(s)
  • image
    2010 - Phillipston Bridge
      State: Massachusetts ;    Year: 2010 ;    Location: MA Route 2 / US 202 over MA Route 2A (State Road) in the town of Phillipston in Worcester County, approximately 65 miles northwest of Boston ;    Spans: One-span ;    Dimensions: 60.67-ft-long and 50.67-ft-wide out-to-out single-span steel girder bridge roll-in; 30º skew; 245-ton self-weight ;    Beam Material: Steel ;    Structural Solutions: Precast abutment cap w/backwall; FDcBs (Full-width decked beam); Asphalt overlay w/membrane ;    Geotechnical Solutions: ;    Project Planning: State process; Design-Build; Full lane closure; Incentive / disincentive clauses; No Excuse bonus; Lump Sum bonus ;    Construction Equipment: SPMT(s)
  • image
    2007 - Parker River Bridge
      State: Massachusetts ;    Year: 2007 ;    Location: Parker River National Wildlife Refuge on Plum Island, an eight-mile stretch of land just off the Massachusetts coastline ;    Spans: Three-span ;    Dimensions: 90-ft-long and 30-ft-wide three-span continuous-for-live-load precast slab beam bridge (30 ft – 30 ft – 30 ft) ;    Beam Material: Concrete ;    Structural Solutions: Adjacent slab beams; Precast pile caps; Precast abutment stems; Precast wingwalls; Grouted key closure joints; PT ducts/un-bonded; Socket connection (in precast substructure) ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build ;    Construction Equipment: Conventional