ABC Project Database

117 bridges found
  • image
    2011 - Buffalo Creek Bridge
      State: South Dakota ;    Year: 2011 ;    Location: Border Line Road over Buffalo Creek approximately 24 miles west of the town of White Butte in Perkins County ;    Spans: One-span ;    Dimensions: 60-ft-long and 30.67-ft-wide single-span adjacent T beam (prestressed double tee) bridge ;    Beam Material: Concrete ;    Structural Solutions: Adjacent T beams (double tee); Steel sheet piling; Other abutment element: precast planks; Grouted key closure joints ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure ;    Construction Equipment: Conventional
  • image
    2011 - I-84 Bridge F-114
      State: Utah ;    Year: 2011 ;    Location: On I-84 in Morgan County 0.8 miles east of the community of Taggart, northeast of Salt Lake City ;    Spans: Three-span ;    Dimensions: Twin 147-ft long and 35-ft wide three-span (55.83 ft – 48.67 ft – 42.17 ft) prestressed concrete I-beam bridge; 49º skew; 1432.39-ft horizontal curve radius ;    Beam Material: Concrete ;    Structural Solutions: Full-depth precast deck panel w/o PT; Grouted key closure joint; Grouted blockout w/shear connectors; Asphalt overlay w/membrane; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; Design-bid-build; A+B+C bidding; Lane rental; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    2011 - I-15 / Sam White Lane Bridge
      State: Utah ;    Year: 2011 ;    Location: On Sam White Lane over I-15 in the city of American Fork in Utah County, 30 miles south of Salt Lake City ;    Spans: Two-span ;    Dimensions: 354-ft long and 76.8-ft wide two-span continuous steel plate-girder bridge (177 ft – 177 ft) roll-in; 48º skew; 1,910-ton self-weight ;    Beam Material: Steel ;    Structural Solutions: ; FDcBs (full-width concrete-decked steel beam unit); CIP reinforced concrete closure joints; Thin-bonded epoxy overlay; LWC deck ;    Geotechnical Solutions: ;    Project Planning: State process; Design-build; Full lane closure ;    Construction Equipment: SPMT(s)
  • image
    2011 - I-5 / US 12 Bridge at Grand Mound
      State: Washington ;    Year: 2011 ;    Location: US 12 over I-5 at Grand Mound in Thurston County, south of Olympia ;    Spans: Two-span ;    Dimensions: 176-ft long and 84-ft wide two-span (88 ft – 88 ft) prestressed deck bulb T girder bridge; 29.4º skew ;    Beam Material: Concrete ;    Structural Solutions: Adjacent deck bulb T beams; Precast cap & column(s); CIP reinforced concrete closure joints; Grouted key closure joints; Grouted duct connection (in precast substructure); Precast diaphragms ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build ;    Construction Equipment: Conventional
  • image
    2011 - Salem Street Bridge Eastbound (93Fast14)
      State: Massachusetts ;    Year: 2011 ;    Location: Interstate 93 Southbound over Salem Street / Route 60 Eastbound in the city of Medford in Middlesex County, approximately five miles north of Boston ;    Spans: Three-span ;    Dimensions: 160-ft-long and 68.79-ft wide adjacent three-span modular-beam-and-deck bridges (38 ft – 78 ft – 38 ft) ;    Beam Material: Steel ;    Structural Solutions: MDcBs (modular concrete-decked steel beams); CIP reinforced concrete closure joints; HESt-LSh concrete joints; Link slab; Asphalt overlay w/membrane ;    Geotechnical Solutions: Reused Substructure/Foundation Unit ;    Project Planning: State process; Early environmental clearance & permitting; Electronic shop drawing submittal & approval process; Design-Build; Full lane closure; Warranty; Incentive / disincentive clauses; No Excuse bonus; Value Engineering ;    Construction Equipment: High-capacity crane(s)
  • image
    2011 - Lake Champlain Bridge
      State: New York ;    Year: 2011 ;    Location: connects NY 185 in Crown Point, New York to VT 17 in Chimney Point, Vermont across Lake Champlain ;    Spans: > Three-span ;    Dimensions: 2,200-ft long and 47.33 ft to 56.67 ft wide eight-span, two-lane modified network tied arch bridge (240 ft, 3 @ 250 ft, 480-ft main span with 402-ft arch, 250 ft, 2 @ 240 ft) with 75-ft main span vertical clearance ;    Beam Material: Steel ;    Structural Solutions: arch span w/o deck; full-depth precast deck panel w/PT; precast caisson caps; prefabricated railing ;    Geotechnical Solutions: micropiles ;    Project Planning: ; early environmental clearance & permitting; electronic shop drawing submittal & approval process; Design-Bid-Build ;    Construction Equipment: float in; strand jacks
  • image
    2011 – SR 303 Manette Bridge
      State: Washington ;    Year: 2011 ;    Location: Kitsap County ;    Spans: > Three-span ;    Dimensions: Seven span precast, post-tensioned concrete variable depth I-girder with CIP deck. One 160' span, five 250' spans and one 140' span. 32' roadway width and 12' sidewalk. ;    Beam Material: Concrete ;    Structural Solutions: Precast caisson caps ;    Geotechnical Solutions: ;    Project Planning: ; Design-Bid Build ;    Construction Equipment: High-capacity crane
  • image
    2010 - Eastern Avenue Bridge (DC)
      State: District of Columbia ;    Year: 2010 ;    Location: Eastern Avenue over Kenilworth Avenue NE (I-295) in the northeastern corner of Washington, DC at the border with Prince George’s County, Maryland ;    Spans: Two-span ;    Dimensions: 84.67-ft-long two-span modular decked steel beam bridge (42.33 ft – 42.33 ft); 180-ft wide at abutments and 156-ft wide at interior pier due to curvature of bridge fascia ;    Beam Material: Concrete ;    Structural Solutions: MDcBs (Modular decked beams); Precast cap & column(s); CIP reinforced concrete closure joints; Grouted key closure joints; Asphalt overlay w/membrane; LWC deck ;    Geotechnical Solutions: Other foundation/wall: undercut unsuitable in-situ materials and replaced with compacted aggregate base under spread footing ;    Project Planning: ; Design-bid-build; Full lane closure ;    Construction Equipment: Conventional
  • image
    2010 - North Kahana Stream Bridge
      State: Hawaii ;    Year: 2010 ;    Location: Route 83 (Kamehameha Highway) near the Kahana Bay Beach Park in eastern Oahu ;    Spans: Three-span ;    Dimensions: 128-ft-long and 42.33-ft-wide three-span precast prestressed concrete slab beam bridge (41 ft – 46 ft – 41 ft) ;    Beam Material: Concrete ;    Structural Solutions: Adjacent slab beams; Grouted key closure joints ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Full lane closure; Lane rental; Incentive / disincentive clauses ;    Construction Equipment: Conventional
  • image
    2010 - Vista Interchange Bridge
      State: Idaho ;    Year: 2010 ;    Location: Vista Avenue over Interstate 84 in Ada County in the city of Boise ;    Spans: Two-span ;    Dimensions: 182-ft-long and 197-ft-wide two-span prestressed I-beam bridge (90.5 ft – 91.5 ft) ;    Beam Material: Concrete ;    Structural Solutions: Precast column cap (precast bent cap; precast crossbeam); Precast abutment cap; MSE wall; Bars in splice couplers; Grouted duct connection (in precast substructure) ;    Geotechnical Solutions: ;    Project Planning: ; Design-bid-build; Lane rental; Value Engineering ;    Construction Equipment: Conventional